![GE GCG001 Quick Start Manual Download Page 8](http://html1.mh-extra.com/html/ge/gcg001/gcg001_quick-start-manual_4039414008.webp)
COM
—
indicates the status of Genius Bus communications.
Green, ON steady
The Genius Bus is configured and operating properly.
Green, blinking
A Genius Bus error has been detected.
OFF
The Genius Bus has failed or no Genius Bus
configuration has been received.
2.
Hardware Installation
2.1.
Initial Checks
Upon receiving your RX3i equipment, carefully inspect all shipping containers for damage. If
any part of the system is damaged, notify the carrier immediately. The damaged shipping
container should be saved as evidence for inspection by the carrier.
As the consignee, it is your responsibility to register a claim with the carrier for damage
incurred during shipment. GE’s Automation & Controls will fully cooperate with you, however,
should such action be necessary.
After unpacking the RX3i equipment, record all serial numbers. Serial numbers are required if
you should need to contact Customer Care during the warranty period. All shipping
containers and all packing material should be saved should it be necessary to transport or
ship any part of the system.
Verify that all components of the system have been received and that they agree with your
order. If the system received does not agree with your order, contact Customer Care.
2.2.
Installation Location
This product is intended for use with the RX3i system. Its components are considered open
equipment (having live electrical parts that may be accessible to users) and must be installed
in an ultimate enclosure that is manufactured to provide safety. As a minimum, the enclosure
shall provide a degree of protection against solid objects as small as 12mm (e.g. fingers). This
equates to a NEMA/UL Type 1 enclosure or an IEC60529 IP20 rating providing at least a
GFK-2891C
7