Operation
3-7
March 2008
Foundation Fieldbus
Communications
Foundation Fieldbus provides a means of communicating with the
flowmeter. The patent numbers which apply are 5,909,363 and
6,424,872.
This Foundation Fieldbus device supports 2 Analog Input (AI)
blocks, which can be configured to supply the following
measurements on the network (see Table 3-3 below).
Table 3-3: Available Measurements Using a Foundation Fieldbus Device
Channel 1
Units
Channel 1
Units
Channel 1
Units
Ch1 Velocity
ft/s or m/s*
Ch1 Mass Flow
MASS_U
Ch1 SSUP
none
Ch1 Act Volumetric
VOL_U
Ch1 Fwd Mass Totals
MTOT_U
Ch1 SSDN
none
Ch1 Std Volumetric
VOL_U
Ch1 Rev Mass Totals
MTOT_U
Ch1 Sound Speed
ft/s or m/s*
Ch1 Fwd Totals
TOT_U
Ch1 #Mass Tot Digits
none
Ch1 Density***
see note
Ch1 Rev Totals
TOT_U
Ch1 Timer
sec
Ch1 Temperature
Deg F or C*
Ch1 #Tot Digits**
none
Ch1 Error Code
none
Ch1 Pressure
PRESS_U
*Metric or English units are determined by the setup of the flowmeter.
**Totalizer digits are available for informational purposes only. Respective totals are automatically scaled
by the Tot Digits value selected in the flowmeter setup.
***If the meter is outputting Mole Weight, the unit is “mw”, otherwise it is the programmed pressure unit.
VOL_U, TOT_U, MASS_U, MTOT_U and PRESS_U are determined by the units chosen for these measure-
ments in the flowmeter setup. See the instrument User's Manual for the setup of these parameters.
Summary of Contents for DigitalFlow GS868
Page 6: ...Chapter 1...
Page 28: ...Chapter 2...
Page 40: ...Chapter 3...
Page 41: ...Operation Introduction 3 1 Powering Up 3 2 Using the Display 3 3 Taking Measurements 3 5...
Page 49: ...Chapter 4...
Page 50: ...Specifications General 4 1 Electrical 4 2 Operational 4 4 Transducer 4 4 Flowcell 4 5...
Page 56: ...Appendix A...
Page 57: ...CE Mark Compliance Introduction A 1 Wiring A 1 External Grounding A 1...
Page 59: ...Appendix B...
Page 60: ...Data Records Option Cards Installed B 1 Initial Setup Data B 2...
Page 64: ...Appendix C...
Page 71: ...Appendix D...
Page 72: ...Measuring P and L Dimensions Introduction D 1 Measuring P and L D 1...