Chapter 1. Installation
12
DigitalFlow™ GF868 Startup Guide (1 and 2-Channel)
1.7.4e Wiring the Foundation Fieldbus Network
Fieldbus network connections are made at J8/J9, pins 1 and 2 (see Figure 5). Optionally, a shield can be connected to
J8/J9 pin 3, depending on the network wiring. Connector J8 or J9 will be installed depending on the option ordered by
the customer.
No connections are made to J8/J9, pins 7 and 9, under normal operation. If it is desired to reset the network board to
factory defaults:
1.
Connect a jumper between J8/J9 pin 7 and pin 9.
2.
Power cycle the instrument.
3.
Ten seconds after the power has been restored to the unit, remove the jumper to return the network board to normal
operation.
Figure 5: Network Connections - Standard Option Interior
1
9
J8
1
9
J9
Summary of Contents for DigitalFlow GF868
Page 2: ......
Page 4: ...ii no content intended for this page...
Page 30: ...Chapter 1 Installation DigitalFlow GF868 Startup Guide 1 and 2 Channel 20...
Page 42: ......
Page 58: ...48 DigitalFlow GF868 Startup Guide 1 and 2 Channel no content intended for this page...
Page 62: ...52 DigitalFlow GF868 Startup Guide 1 and 2 Channel no content intended for this page...
Page 68: ...Appendix C Optional Enclosures DigitalFlow GF868 Startup Guide 1 and 2 Channel 58...
Page 74: ...Warranty 64 DigitalFlow GF868 Startup Guide 1 and 2 Channel no content intended for this page...
Page 78: ......
Page 79: ......