29
Installation Instructions
REPLACE THE BASE GRILLE
Replace the grille by installing the two
Phillips head screws.
7
SET THE CONTROLS
Set the controls to the recommended
setting.
8
START THE ICEMAKER
Set the icemaker power switch to the
I (on)
position. The icemaker will not
begin to operate until it reaches its
operating temperature of 15°F (–9°C)
or below. It will then begin operation
automatically. It will take 2–3 days to
fill the ice bin.
NOTE:
In lower water pressure conditions, the
water valve may turn on up to 3 times
to deliver enough water to the icemaker.
9
Power
switch
Summary of Contents for CustomStyle GCL22QGT
Page 40: ...40 ...
Page 120: ...120 Notas Soporte al consumidor Solucionar problemas Operación Seguridad Instalación ...
Page 121: ...121 Soporte al consumidor Solucionar problemas Operación Seguridad Instalación Notas ge com ...
Page 122: ...122 Notas Soporte al consumidor Solucionar problemas Operación Seguridad Instalación ...
Page 123: ...123 Soporte al consumidor Solucionar problemas Operación Seguridad Instalación Notas ge com ...