This direction contains physical and electrical data necessary for planning and preparing a site.
Pre-installation work is defined as site preparation for installation of the GE CT scanner. It is the
responsibility of the purchaser to arrange and pay for this work. Pre-installation work includes:
•
Installation of electrical conduit, junction boxes, ducts, outlets, and line safety switches.
•
Installation of interconnection wiring that is AWG stranded copper. The electrical contractor shall
ring out and tag all wires at both ends. Color-coded wires are recommended for easier identifi-
cation. Wires shall be continuous without splices. Ground wires must conform to local codes.
•
Any site renovation.
•
Alterations and modifications to products not specifically included in the sales contract.
All work must conform to local building and safety codes. Unless specifically mentioned, GE
Healthcare does not provide or install wires, conduits, junction boxes, and ducts as illustrated in this
publication.
All CT site plans, preliminary concepts and final working drawings must be reviewed by General
Electric Headquarters Architectural Planning prior to construction or approval.
Contact your local General Electric sales representative for complete information regarding your
site-specific room layout.
Section 1.0
Site Readiness
Site ready is a requirement that must be achieved to install a CT product. For your convenience, a
site ready visit inspection shall be performed at least three (3) days prior to the installation date. The
site inspection must conclude with a minimum of a conditional pass status to be ready on the
requested installation delivery date. Site ready inspections on the delivery date will not be
acceptable unless prior arrangements have been made.
Pre-Installation and Site Ready Tools:
•
Floor template for BrightSpeed with H-Power Table (P/N 5160024)
•
Floor template for BrightSpeed with GT1700 Table (P/N 5341997)
•
Pre-Installation check List
•
Pre-Installation Block Diagram
•
Site Room Layouts
•
Power and Grounding Inspection
•
Pre-Installation Support