background image

Summary of Contents for Bottom-Freezer Built-In Refrigerator

Page 1: ...Installation Instructions 36 Built In Bottom Freezer Refrigerators Design6uide With InstallationInstructions Pub No 49 60468 PartNo 224D1145PO01 07 06JR 0 Monogram...

Page 2: ...this appliance only for its intended purpose Immediately repair or replace electric service cords that become frayed or damaged Unplug the refrigerator before cleaning or making repairs Repairs should...

Page 3: ...p Frame I 6 Frame to Frame Width Depth Includin Handles 26 7 8 Frame_ Models 27 3 4 Staintess SteelModels 28 11 16 professional StyleModels Shipping height The refrigerator canbeadjusted to fit intoa...

Page 4: ...abinets Thecasetrim overlaps cabinetsatthe topendsides Therefore frameLess cabinetsmay require fillerstripsto preventinterference with cabinetdoorswing The opening must allowfor filler strips Case Tri...

Page 5: ...8 FromRearof Refri rator Frameless Cabinets The casetrim overlaps cabinets atthe top andsides Therefore frameless cabinetsmay requirefiller stripsto preventinterference with cabinetdoor swing The ope...

Page 6: ...cer Panel DoerHandle I 4 ThickBacker Panel Standard supplied handlesshownin314 overlay panel position Door and Drawer Handles The standard supplied handles can be adjusted to accommodate both framed o...

Page 7: ...1 4 BackerPanel 33 7 8 8 7 8 46 1 16 21 7 8 0 10 Spacer Panel 32 1 2 7 5 8 44 11 16 20 1 2 3 4 OverlayPanel 34 1 8 9 46 5 16 22 3 4 OVERLAY PANEL DIMENSIONS For a more custom appearance overlay panels...

Page 8: ...as shown to allow clearance for corner keys in the front side trim Depending on installation height 84 ZUG2 GRILLE PANEL DIMENSIONS The ZUG2 unified grille panel kit provides for the installation of...

Page 9: ...strong enough to support a fully loaded refrigerator or approximately 1 200 lbs NOTE Protect the finish of the flooring Cut a large section of the cardboard carton and place under the refrigerator wh...

Page 10: ...ure must be between 40 and 120 p s i Route 1 4 OD copper or GE SmartConnect plastic tubing between house cold water line and the water connection location Tubing should be long enough to extend to the...

Page 11: ...de son basculement ve_ l avanL Cut a 2 x 4 x 35 block and secure the block to the mounting brackets provided using 12 or 14 wood screws 2x4Cut _ 35 Length A _ l Installation Mounting Height Bracket Fr...

Page 12: ...plaqu6 ou des glissi6res II est 6galement possible d ajouter des baguettes de linition des placards sur le haut de l ouverture afin de la r6duire Lever le rffrig6rateur de plus de 25 mm 1 po endommag...

Page 13: ...rew door stop and reinstall into the 90 position I I PinLocation For PinLocation as Shipped 130 DoorSwing Reinstall the wire cover trim STEP 9 INSTALL GRILLE PANEL Raise the grill panel to stop positi...

Page 14: ...in1 4 panelposition Install door and drawer panels Open door to 90 Remove the 4 Phillips head screws from the door handle Remove handle Retain all screws Remove 4 screws holding trim lift off trim Ret...

Page 15: ...emove 4 screws holding trim lift off trim Retain screws Slide overlay panel into the door trim There are two sets of holes in the handle side trim Replace handle side trim by installing the original s...

Page 16: ...h a wrench Overtightening can cause leaks Turn on the water to check for leaks Note Make sure excess tubing length does not interfere with drawer closing or toekick installation STEP 121 CONNECT POWER...

Page 17: ...rews provided adjust to desired height and tighten screws A custom toekick can be installed to match or complement the surrounding cabinetry Use the supplied toekick as a template to cut out the notch...

Page 18: ...Notes 18...

Page 19: ...Notes 19...

Page 20: ...ogram local service in your area call 1 800 444 1845 NOTE Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change witho...

Reviews: