45 | GE Oil & Gas
© 2016 General Electric Company. All rights reserved.
UUU
XXX
VVV
WWW
Figure 46
VVV
YYY
WWW
UUU
Figure 47
DDD or FFF
I
OOO
CCC
NNN
LUBRICATE
ADJUSTING
SCREW(JJJ)
Figure 45
Cap Assembly
(Figures 45-51)
Step 57: Insert the Control Spring (NNN) assembly from Step 55
into the Spring Chamber (DDD or FFF). Fasten the Tube Cap (OOO)
to the Inner Tube (CCC) with 4, 8-32 x 1/2” SHCS 316 SS (I). Use Tube
Cap SS (000) and 8-32 x 1/2” SHCS Alloy (I) for the 1500 Model.
Step 58: For either the VRP-600-SB-PID (Figure 46) or
VRP-1000/1500-SB-PID (Figure 47), slide a –141 O-Ring (WWW)
over the Cartridge Cap (XXX or YYY), and a –115 O-Ring (UUU)
over the Seal Neck (VVV). Thread the Seal Neck (VVV) into the
Cartridge Cap (XXX or YYY).