Installation Preparation
PREPARE THE OPENING
(CONT.)
Installation over a GE/Monogram
Warming Drawer:
NOTE:
Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location does not
obstruct the required interior depth and height. See
Warming Drawer installation instructions for details.
27” or 30”
23-1/2”
25-1/8”
17-1/2”
9-1/4”
36-3/4”
Min.
2” Min.
Install 2 x
4 or 2 x 2
Runners
or Solid
Bottom.
Must
Support 100
lbs.
Construct
Solid Bottom
Min. 3/8”
Plywood
Supported
by 2 x 4 or
1 x 2 Runners
all Four Sides
6
PREPARE THE OPENING
The Advantium 120 can be installed in combination
with other GE/Monogram appliances. Always follow
each product’s Installation Instructions to complete
the installation.
Single Advantium 120 Installation:
Order a 27” or 30” wide single oven cabinet or cut
the opening in a wall to the dimensions shown.
$OZD\VPDLQWDLQµPLQLPXPKHLJKWIURP
the floor to the cutout in any single or combined
installation.
$OORZµFDVHWULPRYHUODSDWWKHWRSDQG
7/8” overlap on the bottom and each side of the
opening.
2YHQRYHUODSVZLOOFRQFHDOFXWHGJHVRQDOOVLGHV
of the opening.
When installed over a single oven or a warming
drawer, allow at least 2” between the two openings.
This separation will provide clearance for bottom
overlap of the Advantium 120 and the other
appliance overlaps.
Construct a solid oven floor of 3/8” min. thick
plywood supported by 2 x 4 runners on all sides.
7KHVXSSRUWPXVWEHOHYHODQGULJLGO\PRXQWHG
flush with the bottom edge of the cutout.
27” or 30”
23-1/2”
25-1/8”
17-1/2”
Construct
Base
Min. 3/8”
Plywood
Supported
by 2 x 4
or 1 x 2
Runners all
Four Sides
36-3/4”
Min.
Summary of Contents for Advantium ZSC1001J1SS
Page 1: ......