5
Standard Installation Preparation
PREPARE THE OPENING
(CONT.)
Installation over a GE Appliances/
Monogram Warming Drawer:
NOTE:
Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location does
not obstruct the required interior depth and height.
See Warming Drawer installation instructions for
details.
30”
23-1/2”
25-1/4”
17-1/2”
36-3/4”
Min.
2” Min.
(3” Recommended
)
Per Warming
Drawer
Requirement
Construct
solid bottom
- Min. 3/8”
plywood
supported
on all four
sides. Must be
able to support
weight of oven
and contents.
PREPARE THE OPENING
The Advantium 120 can be installed in
combination with other GE Appliances/
Monogram appliances. Always follow each
product’s Installation Instructions to complete the
installation.
Single Advantium 120 Installation:
Order a 30” wide single oven cabinet or cut the
opening in a wall to the dimensions shown.
•
Allow 1-1/4” case trim overlap
at the top and 7/8” overlap on the bottom and
2-1/4” overlap for each side of the opening.
•
Oven overlaps will conceal cut edges on all
sides of the opening.
When installed over a single oven or a
warming drawer, allow at least 2” between
the two openings. This separation will provide
clearance for bottom overlap of the Advantium
120 and the other appliance overlaps.
•
The support must be level and rigidly mounted,
flush with the bottom edge of the cutout.
30”
23-1/2”
25-1/4”
17-1/2”
Construct
solid bottom
- Min. 3/8”
plywood
supported
on all four
sides. Must
be able to
support
weight of
oven and
contents.
36-3/4”
Min.
IMPORTANT:
Always maintain 36-3/4” minimum height from the floor to the cutout in any single or
combined installation unless plastic trim is installed.
Summary of Contents for Advantium CSB9120
Page 15: ...15 Notes...
Page 31: ...15 Notas...