•
4
Confirm Upload by pressing
OK buttons.
•
5
Then Disconnect if you desire to program more than one Unit or exit if programming procedure is
finished
.
•
6
Once that the UPS has been replaced and E8a is connected to the new Control board, connect again by
pressing Connect button (as shown in following picture) and restart from point 1
.
Modifications reserved
12
ISG_VHS_FRM_UPD_XGB_V010.doc