Functional and electrical safety checks:
Overview
8-2
Dash 3000/4000/5000
2000966-542D
Overview
Manufacturer recommendations
These safety tests and checkout procedures provide service personnel
with a method to verify operational and functional performance of the
patient monitor. Safety and functional checkout tests should be
documented in the Checklist provided in
on page D-1. Failure
to attain any of the listed results indicates a potential malfunction of the
patient monitor.
WARNING
The personnel assessing the safety of the patient monitor
shall be able to recognize possible consequences and risks
arising from non-conforming equipment.
The safety tests and checkout procedures are based on the assumption
that the tested patient monitor has known good cables and test
equipment. It also requires qualified personnel who are familiar with the
operation of all test equipment required for the procedures. For more
information concerning the operation of these components, refer to the
respective operator manual(s).
Frequency
Qualified personnel must perform the checkout procedures:
Every 12 months after receipt of the device (Preventive
Maintenance). Refer to
on page 5-2 for more
information.
Each time the main enclosure is disassembled or a circuit board is
removed, tested, or replaced (Corrective Maintenance). Refer to
on page 7-52 for more information.
Test equipment
The safety tests and checkout procedures are written for the GE
recommended test equipment listed for each test. If you use test
equipment other than those GE recommends, you may need to slightly
modify some test steps.
Summary of Contents for 001C 051D 003A
Page 10: ...viii Dash 3000 4000 5000 2000966 542D ...
Page 11: ...2000966 542D Dash 3000 4000 5000 1 1 1 Introduction ...
Page 20: ...Introduction Service information 1 10 Dash 3000 4000 5000 2000966 542D ...
Page 21: ...2000966 542D Dash 3000 4000 5000 2 1 2 Equipment overview ...
Page 64: ...Equipment overview Theory of operation 2 44 Dash 3000 4000 5000 2000966 542D ...
Page 65: ...2000966 542D Dash 3000 4000 5000 3 1 3 Installation ...
Page 73: ...2000966 542D Dash 3000 4000 5000 4 1 4 Configuration ...
Page 99: ...2000966 542D Dash 3000 4000 5000 5 1 5 Preventive maintenance ...
Page 117: ...2000966 542D Dash 3000 4000 5000 6 1 6 Troubleshooting ...
Page 146: ...Troubleshooting Wireless LAN 6 30 Dash 3000 4000 5000 2000966 542D ...
Page 147: ...2000966 542D Dash 3000 4000 5000 7 1 7 Field replaceable units ...
Page 201: ...2000966 542D Dash 3000 4000 5000 8 1 8 Functional and electrical safety checks ...
Page 257: ...2000966 542D Dash 3000 4000 5000 A 1 A Electromagnetic compatibility EMC ...
Page 267: ...2000966 542D Dash 3000 4000 5000 B 1 B Network troubleshooting ...
Page 279: ...2000966 542D Dash 3000 4000 5000 D 1 D Checklist ...
Page 281: ......