7–10
469 MOTOR MANAGEMENT RELAY – INSTRUCTION MANUAL
CHAPTER 7: TESTING
7.2.8
Output Relays
To verify the functionality of the output relays, perform the following steps:
Using the settings:
S13 TESTING
ZV
TEST OUTPUT RELAYS
Ö
FORCE OPERATION OF RELAYS:
“1 Trip”
Z
Select and store values as per the table below, verifying operation
Note
The 6 SERVICE relay is failsafe or energized normally. Operating the 6 SERVICE relay causes
it to de-energize.
FORCE
OPERATION
SETTINGS
EXPECTED MEASUREMENT
4
FOR SHORT
ACTUAL MEASUREMENT
4
FOR SHORT
1
2
3
4
5
6
1
2
3
4
5
6
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
1 TRIP
4
4
4
4
4 4
2 AUXILIARY
4 4
4
4
4 4
3 AUXILIARY
4
4 4
4
4 4
4 ALARM
4
4
4 4
4 4
5 BLOCK START
4
4
4
4 4
4
6 SERVICE
4
4
4
4
4
4
All Relays
4
4
4
4
4
4
No Relays
4
4
4
4
4 4
Summary of Contents for 469
Page 62: ...2 16 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL CHAPTER 2 INTRODUCTION ...
Page 90: ...3 28 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL CHAPTER 3 INSTALLATION ...
Page 292: ...6 42 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL CHAPTER 6 ACTUAL VALUES ...
Page 313: ...A APPENDIX 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL A 7 HGF5C 808841A1 HGF8 808842A1 ...
Page 315: ...A APPENDIX 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL A 9 808712A1 CDR ...
Page 320: ...A 14 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL A APPENDIX ...