![GE Lighting LED 165 Installation Manual Download Page 2](http://html.mh-extra.com/html/ge-lighting/led-165/led-165_installation-manual_571983002.webp)
Parts List:
• 1 Steel Ring
• 1 U-shape rod
2 mounted nuts
• 3 High Temperature Lock Nuts
(1 extra nut is provided for your convenience)
• 1 Tether Kit
includes: 1 tether wire (2m), 1 locker, 1 hook
Installation Guide
LED165/M400/740 Tether Kit
Instructions:
Step 1.
Turn off the power.
Remove the LED lamp from the fixture.