Features

• UL 1598 Suitable for Wet Locations

• IP66 Rated Ingress Protection

Albeo

TM

 LED Luminaire

 WARNING/AVERTISSEMENT

RISK OF ELECTRIC SHOCK
• Turn power off before inspection, installation or removal.
• Properly ground electrical enclosure.
RISK OF FIRE
• Follow all NEC and local codes.
• Use only UL or IEC approved wire for input/output connections. 

  Minimum size 18 AWG.

RISQUES DE DÉCHARGES ÉLECTRIQUES
• Coupez l’alimentation avant d’inspecter, installer ou déplacer le luminaire.
• Assurez-vous de correctement mettre à la terre le boîtier d’alimentation électrique.
RISQUES D’INCENDIE
• Respectez tous les codes NEC et codes locaux.
• N’utilisez que des fils approuvés par UL ou IEC pour les entrées/sorties de  

  connexion. Taille minimum 18 AWG.

BEFORE YOU BEGIN

Read these instructions completely and carefully.

This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and 

(2) this device must accept any interference received, including interference that may cause undesired operation. CAN ICES-005 (A) / NMB-005 (A)

Note: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are 

designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment 

generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful 

interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be 

required to correct the interference at his own expense.

Save These Instructions

Use only in the manner intended by the 

manufacturer. If you have any questions, 

contact the manufacturer.

Prepare Electrical Wiring

Electrical Requirements

The LED driver must be supplied with 

120-277 VAC or 347/480 VAC, 50/60 Hz per product 

label and connected to an individual properly 

grounded branch circuit, protected by a 15 or 20 

ampere circuit breaker. 

Grounding Instructions

The grounding and bonding of the overall system 

shall be done in accordance with National Electric 

Code (NEC) Article 600 and local codes.

imagination at work

Summary of Contents for Albeo ABR1 Series

Page 1: ... interference that may cause undesired operation CAN ICES 005 A NMB 005 A Note This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can rad...

Page 2: ...box Loop chain cable through the mounting slots next to each fixture end Chain cable mounting locations must be in the slots at the ends of the fixture Dual Fixture Single Fixture Provide at least 12 of clearance from the top of the fixture to any ceiling or surface above Chain or Cable Mounting Carefully unpack unit and properly inspect for defects before installing Wear work gloves to prevent di...

Page 3: ...re connectors Close junction box 3 2 5 Pendant Mounting AC power cord The 0 10V dimming option uses a separate 2 conductor SOOW cable Install cable per NEC and local codes For pendant mount option cord can be run through 1 2 NPT hole on top of the mount box A 10V signal corresponds to 100 lumen output A 0V signal corresponds to 15 lumen output Shorting the dimming wires dims the fixture to 15 lume...

Page 4: ...ither the 3 or the 12 hole pattern Determine rotation of fixture and lock orientation in place both sides with provided 2 1 8 hex drive screws NOTE Optional safety chains can be used in 3 8 holes in sides of bracket and in the mounting slots at the end of fixture Lift fixture up and insert provided 2 1 4 hex drive bolts through brackets then install provided locknuts 3 4 2 3 12 1 2 bolts Safety ch...

Page 5: ...ontrollers Maintenance Product should not be disassembled during installation process and or while installed Lens should be cleaned periodically for maximum lumen output Inspect and clear any build up on cooling fins periodically for maximum performance www gelighting com GE and the GE Monogram are trademarks of the General Electric Company All other trademarks are the property of their respective...

Reviews: