Summary of Contents for GDS 4LV

Page 1: ...n quality imported components Installation and Maintenance Manual Industrial Swing Gate Operator Model GDS 4LV ATA CB 6 controls Made in Australia from Australian quality imported components A B N 62 059 806 405 Jan 2016 V1 01 N14870 Installation and Maintenance Manual Industrial Swing Gate Operator ...

Page 2: ...2 Specifications 4 3 Installation Details 4 7 Electrical Cabling Mechanical Installation Electrical Connections 4 Commissioning 8 5 CB 6 control board layout 9 6 Control circuit diagram 10 11 7 Manual Release Instructions 12 8 Maintenance 13 9 Warranty 14 ...

Page 3: ... equipment and personnel Extra caution should be employed when using operator in auto close mode Display any necessary signs to indicate any danger areas and automatic operation of the gate or door The operators are not designed to be used in any hazardous areas or areas subject to flooding etc All electrical connections and wiring must be performed with AS NZS 3000 2007 as the guidelines Or its c...

Page 4: ...external influences which may assist or de ETAILS After reading the previous sections in this manual and having checked for suitable installation proceed as follows A suitably rated Isolator and 240v power supply should be available near to where the gate operator control box If electrical cabling needs to be run across the driveway where the single gate operator is on the opposite side to the con...

Page 5: ...ast 2 steps may have to be repeated using a cut down secondary arm Now attach the gate bracket to the gate rail with bolts suitable to handle the load and forces the gate and operator provide normally 10mm 5 Firstly determine which gate rail the operator arm is to be mounted to Run a level from the top of the gate rail across to where the operator is Draw a horizontal line on the post or wall whic...

Page 6: ...unconnected if not used All the switch inputs of this control board including the limit switch inputs require a switch contact only Do not connect any switches which provide a voltage to the control board as this will damage the control board If the inputs are 12 24v or has long wiring associated with it use an IM 1 module to isolate it from the control board s input The IM 1 is available from the...

Page 7: ...put also resets the P E triggered auto close mode so that the P E input will need to be triggered again before a P E auto close cycle will be initiated POSITION 5 M 2 Outputs Status OFF The M2 output controls second motor ON The M2 output controls status lights POSITION 6 P E Stops Close Cycle OFF Activating the P E input while motors are closing causes the motors to reverse ON Activating the P E ...

Page 8: ...on the gate so it is half way tighten manual release knob to the point where the gate will just start to be driven but the clutch will slip if the gate accidentally hits the gate stop too hard while setting up the limits Power up board and with gate in the half way position press transmitter or manual control switch so operator drives gate The first pulse will always open gate green open LED will ...

Page 9: ...9 5 ...

Page 10: ......

Page 11: ......

Page 12: ...IONS Turn power off to the control box and isolate Using key to open side door on gate operator cover Turn knurled disc anticlockwise for arm to be released from gearbox a magnetic lock is fitted turn off the power to the control box If an electric lock is fitted release with the electric lock key provided The gate will now open manually Ensure gate is held firm so it does not close on someone or ...

Page 13: ...ents Comments Service performed by ETAILS WARNING Failure to maintain equipment may result in injury or death and or damage to property and equipment Recommended maintenance to be performed on the operator and gate are as follows Operator performs over 150 cycles a day each month 150 cycles a day every 2 month 99 cycles a day every 4 months 49 cycles a day every 6 months Operator performs under 20...

Page 14: ...ircumstances i If no proof of date of purchase can be produced ii If the product has been used in a manner beyond its design parameters iii If the product is tampered with or repaired by personnel not authorised to do so iv In respect of loss or damage caused by rough treatment v If the product is not used and maintained in accordance with instructions or recommendations listed in this Installatio...