JF-2418UV User Manual
164
6.7 Lubrication of the X Rails
The procedure of Lubrication:
Step 1 Power off the machine
Step 2 Move the carriage rightwards or leftwards to allow the grease being injected.
Step 3 Inject 1ml of grease to the injection opening inside the linear bearing on both side.
Note: Lubrication regularly depending on the job loading, recommend on a quarterly basis.
Lubrication Notes
1.
The carriage must move back and forth on one side, while injecting the grease.
2.
Users can apply manual lubrication or automatic lubrication to the Miniature linear rail for
regular maintenance.
3.
There should always be lubricant coated on the surface of the rail.
4.
Apply the lubrication again before the oil changes color due to corrosion.
Lubrication Intervals
1.
The length of lubrication interval depends on the working environment, loading and pressure
bearing condition. The length of the lubrication interval varies, and the safe lubrication
intervals can only be known after careful observation.
2.
Lubrication interval should not exceed one year.
Summary of Contents for JF-2418UV
Page 1: ...JF 2418UV User Manual http www GCCworld com V 1 2022 Mar GCC GCC Club...
Page 3: ...JF 2418UV User Manual 2 Release Note Version Change V 1 2021 Nov Add JF 2418UV User Manual...
Page 24: ...JF 2418UV User Manual 23 Control panel flow...
Page 25: ...JF 2418UV User Manual 24 Operating work flow...
Page 27: ...JF 2418UV User Manual 26 Operating work flow...
Page 28: ...JF 2418UV User Manual 27 Control panel flow O N FRONT REAR O N O N OFF OFF...
Page 42: ...JF 2418UV User Manual 41 B Set the PH Gap Auto Adjustment to be OFF on the control panel...
Page 57: ...JF 2418UV User Manual 56 Step 4 The settings is completed and open FlexiPRINT GCC Edition...
Page 88: ...JF 2418UV User Manual 87 8 Select Advanced...
Page 169: ...JF 2418UV User Manual 168 Step 2 Enter the password caldera Step 3 Click Next...
Page 170: ...JF 2418UV User Manual 169...