background image

 

MIUM0001_REV01_ RKB_20140130 MIUM ENG.docx 

12 

 

 

Electrical connections 

 

 

Qualified personnel according to the supplied schemes must carry out the electrical connections at the control 
panel.  

 

Insure  that  the  voltage  and  the  frequency  shown  on  the  technical  plate  correspond  to  the  connecting  power 
supply. 

 

 

For the general power supply of the unit, and its accessories, the use of adapters, multiple plugs and extension 
leads is to be avoided. 

 

It is the responsibility of the installer to insure that the installation of the unit is as close as possible to 
the mains power supply, or sufficiently close to protect the electrical parts.  

 

Connect the unit to an efficient power point, using the correct screws as supplied with the unit. 

 

In the unit with relay board the screws of the connectors must be screwed with torx equal to 0,5 Nm 

 
 

6

 

 

W

IRING 

D

IAGRAMS

 

 

Follow wiring diagram attached to every unit as a sticker inside the electrical plastic box. 
 
For connection the unit to accessory LVN (relay power box), RCV (3 step fan speed control) and CVU (step fan speed 
selector), please see the diagrams attached to the unit. 
 
 
 

7

 

 

S

TANDARD 

M

AINTENANCE

 

 

 

 

 

It is the responsibility of the User to carry out all types of maintenance operations. 

 

Only personnel previously trained and qualified may carry out maintenance operations. 

 

Should the unit require disassembly, hand protection is required 

 
Maintenance  is  of  extreme  importance  if  the  plant  is  to  operate  in  a  regular  way  and  give  fade-free  service.  Have 
maintenance  work  done  by  qualified  and  authorized  personnel,  according  to  EU  Regulation  303/2008  of  2  April  2008 
(and later) that requires companies and technicians that perform maintenance / repair, leakage checking and recovery / 
recycling  gases  must  be  certified  as  required  by  local  regulations.  Comply  with  the  safety  precautions  given  in  the 
relative section of this manual and take all the necessary precautions. The following information is only a guide for the 
end user. 
Maintenance  keeps  unit  efficiency,  reduce  the  speed  of  deterioration  over  time  and  collect  information  and  data  to 
understand  the  efficiency  of  the  unit  and  prevent  failures.  We  suggest  to  prepare  a  booklet  of  installation  according 
European legislation. Provide a machine book that allows you to track of the actions taken on the unit, so it will be easier 
to cadence adequately the various interventions and will facilitate a possible troubleshooting. 
Please  take  note  of:  date,  type  of  action,  description  of  action,  measurements  performed,  anomalies  identified,  alarms 
registered in the alarm history, etc. ... 
 

Before starting any operation, insure that the general power supply has been isolated. 
All the electrical connections must be protected at the source by the installer. 

Follow the connection of the unit and its accessories using adequate cabling for the power used, and 
respecting  the  country  regulations.  The  dimensions  of  the  cabling  must  be  sufficient  to  support  a 
voltage drop in start up phase inferior to 3% of the nominal. 

BEFORE FOLLOWING ANY TYPE OF MAINTENANCE OPERATION, BE CERTAIN THAT THE UNIT MAY NOT 
CASUALLY OR ACCIDENTALLY BE CONNECTED TO THE ELECTRICAL MAINS SUPPLY. THERFORE IT IS 
NECESSARY TO SHUTDOWN THE UNIT’S POWER SUPPLY AD PRIOR TO MAINTENANCE. 

Summary of Contents for RKB Series

Page 1: ..._ RKB_20140130 MIUM ENG docx 1 I IN NS ST TA AL LL LA AT TI IO ON N O OP PE ER RA AT TI IO ON N A AN ND D M MA AI IN NT TE EN NA AN NC CE E M MA AN NU UA AL L 50 EFFICIENCY AIR TO AIR HEAT RECOVERY UN...

Page 2: ...tive 2004 108 CE and Ecodesign Directive 2009 125 CE The unit belonging to the above series is designed according to the following main safety prescriptions principals of safety integration used mater...

Page 3: ...SHOCK ATTENTION AUTHORIZED PERSONNEL ONLY 1 INTRODUCTION pag 4 2 DIMENSIONS AND WEIGHTS pag 5 3 INSTALLATION CONFIGURATIONS pag 6 4 TRANSPORTATION pag 7 5 INSTALLATION CONNECTION pag 8 6 WIRING DIAGR...

Page 4: ...ordance with the laws in force in the country in which the unit is installed Unauthorized tampering with the electrical and mechanical equipment will VOID THE WARRANTY Check the electrical specificati...

Page 5: ...of the horizontal series RKB M Supply E Exhaust R Return A Fresh air RKB 500 1000 2000 3000 4000 A mm 750 900 1000 1300 1400 B mm 750 900 1000 1300 1400 C mm 290 410 470 530 705 D mm 200 315 355 450 5...

Page 6: ...ve the following combinations each of them is a specific unit orientation to be specified when ordering Horizontal configuration RKB Configurations shown on the figure below are possible A fresh air R...

Page 7: ...h inlet outlet panels for example from E to E90 you may need to exchange two panels between each other Vertical configuration RKB vertical kit Configurations shown on the figure below are possible A f...

Page 8: ...the unit electric and hydraulic connections and any air pipes ducts or free passages Neglecting these aspects may decrease performance and operational life of the unit and therefore increase the opera...

Page 9: ...ers of such products Before placing in function the unit check the perfect connection of the various components and the internal parts of the system Avoid at all costs human contact with moving parts...

Page 10: ...of free space as indicated in the following figure This permits ease of installation and maintenance Machine positioning The unit is equipped with anti vibration support plates Referring to the follow...

Page 11: ...ot interfere with discharge of the unit Water coil connection SAF The water heating or cooling coil SAF is supplied with GAS male threaded headers The tightening must be carried out with extreme care...

Page 12: ...ed and authorized personnel according to EU Regulation 303 2008 of 2 April 2008 and later that requires companies and technicians that perform maintenance repair leakage checking and recovery recyclin...

Page 13: ...ed 8 TROUBLESHOOTING Failure searching and problem solving schedule Founded failure Probable cause Possible solution Fans are not running Power supply is switched off Wrong or loose electrical connect...