ASSEMBLE PIECES
BEFORE SCREWING
THEM TO THE WALL
STEP #4
Set polycarbonate exposed side on the outside over horizontal left guide I-3, use one (1) Rr-3 panel, one (1)
P-3 joint and one (1) Ss-3 panel, then do the right side with one (1) Tt-3 panel, one (1) Q-3 joint and one (1)
Uu-3 panel over the J-3 horizontal guide. Secure P-3 and Q-3 to I-3 and J-3 respectively with self-tapping
screws (PQ-3).
STEP #3
Assemble ML-3, O-3, N-3, and MR-3 as shown
and positio
n evenly above vertical guides, at 96’’
from the ground. Secure wall track and vertical
tracks to brick or cement wall by drilling through
the aluminum
, at intervals of 16”(minimum) and
using screws Xx-3. Insert the 2 horizontal guides,
I3 & J3 at the top of the frame. Make sure the 2
frames are at the correct level, if not, use shims to
compensate. Do not use tools to force.
NOTE:
Once the wall track is in place,
apply silicon along the top of the
wall track and at the joint of the
two tracks.
Silicon is not supplied.