background image

ZZZ-187.W1207-32.1129-17.GP.EN.HER 

 

     HER-HL         7 

STEP #11 
 

On the inside of the solarium under each rafter there are two rows of inserts  with threads.    Start the upper row 
with a Jj-3 at either end and screw it with Ff3 and in between the Kk-3 panels.  Use Ff-3 screws at the lower row 
Ll-3 at the 2 ends then the others in between the Mm-3 panels.  Make sure screws are manually tight.  

 

 

STEP #12

    

DOOR UNIT(S) MUST BE 
ASSEMBLED INSIDE OF 
SOLARIUM. 

Slide  upper  door  track  F-3  into 
wheels of sliding door C-3.  Slide 
lower  door  track  G-3  and  make 
sure  inserts  are  close  enough  to 
the  frame  to  attach.      Use  bolt 
Bb-3  to  affix  the  plastic  stopper 
H-3  on  each  end  of  top  door  rail 
F-3.  Use  Oo-3  screws  to  affix 
upper  door  rail  and  cap  Nn-3,  at 
each end of top rail door. 

Summary of Contents for W1207-32

Page 1: ...ARIUM ASSEMBLY INSTRUCTIONS DO NOT DESTROY THE BOXES UNTIL COMPLETELY ASSEMBLED Assembly by more than one person is suggested Requires 96 clearance at the wall Base Dimensions 144 x 94 1 2 Largest Dim...

Page 2: ...B3 for the direction of the door when open Use E3 between frame ends and use two 2 K3 joints for corners NOTE When placing the door frame opening make sure the inserts on the frame are on the inside...

Page 3: ...respectively with self tapping screws PQ 3 NOTE Once the wall track is in place apply silicon along the top of the wall track and at the joint of the two tracks Silicon is not supplied STEP 3 Assembl...

Page 4: ...through joint K 3 with the Bb 3 screw Secure to Q 3 bracket with self tapping screw PQ 3 Repeat on left side with rafter S 3 STEP 6 Set U 3 rafters over the middle of each panel with Bb 3 screws at th...

Page 5: ...should go first and last with the Qq 3 panels in between STEP 8 Insert the aluminum middle roof joint between the rafters making sure the slotted holes are at the bottom Slide into upper and lower gro...

Page 6: ...een the panels and gently tap on the panel to guide it into the aluminum groove Use a spatula if needed to make it fit Insert two 2 Pp 3 on either end then insert the Qq 3 panels STEP 10 Starting at e...

Page 7: ...row Ll 3 at the 2 ends then the others in between the Mm 3 panels Make sure screws are manually tight STEP 12 DOOR UNIT S MUST BE ASSEMBLED INSIDE OF SOLARIUM Slide upper door track F 3 into wheels o...

Page 8: ...the door opening by screwing at the top First use bolts Ww and washers Gg 3 on the inside and female bolts Cc 3 2 on the outside for the top assembly See diagram below Attach lower track with bolts C...

Page 9: ...or pull to one side making sure that locking pin is not locked then remove panels gently panels are easy to remove NOTE This unit is not waterproof For best protection against rain close the windows o...

Page 10: ...IDING DOOR FRAME D 3 2 11 544 CONNECTING PIECE E 3 8 11 545 TOP DOOR RAIL F 3 2 11 546 BOTTOM DOOR RAIL G 3 2 08 138 PLASTIC STOPPER H 3 4 10 500 LEFT SIDE RECEIVER I 3 1 10 501 RIGHT SIDE RECEIVER J...

Page 11: ...10 513 MIDDLE ROOF JOINT V 3 2 10 514 MIDDLE ROOF JOINT W 3 4 10 515 EDGING X 3 2 10 516 EDGING Y 3 4 08 156 SCREW Z 3 10 08 158 BOLT Bb 3 28 08 161 BOLT Cc 3 12 12 037 FEMALE BOLT Cc 3 2 12 08 169 L...

Page 12: ...LEFT RIGHT ROOF PANEL Pp 3 4 10 522 51 X 23 REGULAR ROOF PANEL Qq 3 8 10 523 LEFT BACK GABLE PANEL Rr 3 1 10 524 LEFT FRONT GABLE PANEL Ss 3 1 10 525 RIGHT BACK GABLE PANEL Tt 3 1 10 526 RIGHT FRONT...

Page 13: ...ZZZ 187 W1207 32 1129 17 GP EN HER HER HL 13...

Page 14: ...r Service Department for a complete schedule of replacement parts and prices CONDITIONS FOR EXERCISING THE WARRANTY The warranty only applies to the original purchaser with the bill In order to proper...

Reviews: