![Gazebo penguin 41218 Assembly Instructions Manual Download Page 3](http://html.mh-extra.com/html/gazebo-penguin/41218/41218_assembly-instructions-manual_570487003.webp)
ZZZ-184.41218.1207-18.GP.EN.SUN
WEB VERSION
SUN-HI 2
12x18 Solarium Assembly Instructions
Step 1:
Before starting to assemble, please decide where you would like to position the door panels.
1.
Stand up two regular frames (A), using two connecting pieces (E) and affix the panels (A) together
2.
Assemble door frame separately. Assemble 2 vertical bars (Yy) with 2 horizontal bars (Zz). Make
sure the shape of the aluminum matches the other parts to be joined. With a rubber mallet get
them closed at the corners. Make sure to not damage the aluminum parts. Use screws (Z) to
secure 4 corners manually, screwing all screws into frame 4 predrilled holes.
3. After assembling door frame, attach to frames (B) on either side, by sliding connecting piece (E)
between the frame and the door frame.
4. When assembling angled panels (A, B), you should put the two panels at 135 degree angle then
use the angled connecting pieces (I) and (J) to affix the panels together.