7
7
Landing Sledges Assembly
機身腳架組立
#C
#A
#B
Before locking screws M3x10
and M3x16, refer instruction on
P.8 to adjust.
Before installing, check that the
holes in this aluminum part are
pass through hole.
a.M3x10
a.M3x10
b.M3x16
b.M3x16
b.M3x16
c.M3x3
c.M3x3
c.M3x3
將M3x10及M3x16含上並配合P.8
組裝時再鎖緊。
請注意安裝時需確認 #C 為
貫穿孔。
#A
#208970
#B
#208370
#C
#208400
4
Fuselage Assembly
機身組立
#A
#208344
#B
#208361
#C
#208890
a.M3x6
a.M3x6
b.M3x4
b.M3x4
b.M3x4
c.M3x6
c.M3x6
c.M3x6
c.M3x6
e.M3x12
e.M3x12
e.M3x12
c.M3x6
d.M3x18
e.M3x12
d.M3x18
39.5mm
42.5mm
e.P3x4.8x23.5
#A
#C
#A
#A
#A
#B
1. Complete installation in #B
first. Then proceed to install
metal parts to side frame
in Upper Servo Mount.
2. After completing installation
in P.13, tighten screws M3x18
Apply thread lock on all
screws in this section.
側板螺絲均需上止滑劑
1.先將#B組裝完成再將上圖
組裝完成的金屬件組裝至
側板。
2.M3X18配合P.13組裝完成後
再鎖緊。
GAUI
GAUI
TAI SHIH HOBBY CORPORATION
TAI SHIH HOBBY CORPORATION
Summary of Contents for X5
Page 22: ...7...