background image

Section 1  -  stacked frames  upper section 

The counter gear is assembled from the corresponding parts as shown in the illustration. The pulley No. 13 is 
pushed on until the thread of the grub screw is congruent with the lower blind hole of the shaft and then secured 
with the grub screws M3x3. 
 
Put on the upper bearing block after the rear drive belt has been put on. 

The left upper frame can now be put on 
now.  The rotor shaft should temporary in 
it´s position while screwing all parts 
together.  

Section 2  -  stacked frames  lower section 

Mounte the lower  Chassis parts  parts according to the exploded view by using 
the aluminum chassis posts No.2 and aluminum spacer No. 5, as well as the 
corresponding plastic filler pieces No. 8. Take care for a tension-free installation 
of all parts. The CF side panels must be aligned parallel. The easiest way to do 
this is to place the mechanic on a straight table top while screws still loose. Then 
tighten the screws evenly. 
 
 
Proceed in the same maner with both side parts and complete this step by 
attaching the RC pannel No. 1. 
 
Pay attention to the correct positioning when inserting the lower bearing block of 
the main shaft, see DETAIL B. 
 
 

DETAIL B 

Summary of Contents for NEX6

Page 1: ...GAUI NEX6 Classic Photo Manual...

Page 2: ...0 Servo STD Torque 10Kg or above Main Blade Length 550 610mm Tail Blade Length 92 95mm Total Weight 3100g 3 12S Upgrade 063602 ESC 130A or above Lipo Battery 12S 2 2V 3700mAH Motor 4025 500 520KV Serv...

Page 3: ...t CF upper frame This was fully equipped except for the rear counter gear To ensure 100 alignment of the rotor shaft it should be inserted before tightening the screws and remaining in the pedestals u...

Page 4: ...er Section 2 stacked frames lower section Mounte the lower Chassis parts parts according to the exploded view by using the aluminum chassis posts No 2 and aluminum spacer No 5 as well as the correspon...

Page 5: ...ree play than 1 10mm add one shim Attatch all parts of the lower chassis corresponding to the explosion drawing In addition you may use the illustration on left Please check the correct position and a...

Page 6: ...and secure the bolt No 17 M4x23 with a M4 lock nut Now tighten both screws M3x20 see DETAIL D for reference Complete the blades grips with the sleaves No 21 and balde screws No 22 Safety Check Check...

Page 7: ...e angezogen 5 Schieben Sie den Tail Pitch Slider auf die Welle und best cken Sie den Heckumlenkhebel mit einer Schraube 3x15 sowie einer Distanzscheibe W3 1x5 5x1 1 6 Anlenkhebel aufsetzen und Schraub...

Page 8: ...wurde k nnen alle Schrauben festgezogen werden 5 Nun kann auch das Gegenlager 1 aufgesetzt und gesichert werden siehe DETAIL F Riemen einh ngen wenn Heckrotor nach unten zeigt Danach in Pfeilrichtung...

Page 9: ...ter um alle Servos in Neutralstellung zu bringen und setzen anschlie end die Servoarme entsprechend der jeweiligen Einbauposition auf Roll rechts Roll links Nick Montieren Sie die mit Hebeln ausgestat...

Page 10: ...Ritzel mittels gut zu sichernden Madenschrauben in dieser Position auf der Welle des Motors Um das Zahnflankenspiel des Motors vorab schon zu justieren liegt dem Bausatz eine Lehre bei Verschrauben Si...

Page 11: ...Kabel Sorgen Sie daf r dass keine Kabel durchscheuern k nnen Verwendung von Spiralschlauch Checken Sie ob das zum jeweiligen Motor passende Antriebsritzel verbaut wurde Die maximale Systemdrehzahl be...

Page 12: ......

Reviews: