12
Gateway ALR 9250R User’s Guide
4.
Press the latches on both side rails of the CPU drawer and push the
drawer into the cabinet until the front panel touches the vertical
mounting rails. See the illustration Cabinet Rail Retaining Latches
below. The drawer may move reluctantly at first. However, it should
move smoothly, without binding or restriction, thereafter.
Cabinet Rail Retaining Latches
Connecting peripherals
Refer to “Connecting Peripherals” on page 13 and the following procedures
when connecting optional peripherals to your system.
1.
Power off all drawers and devices in the cabinet prior to attaching any
of the system drawer cables.
To connect peripherals
9250r_16
Latch
Latch
9250R.book Page 12 Friday, April 9, 1999 9:44 AM
Summary of Contents for ALR 9250R
Page 7: ...Contents v Index 193 9250R book Page v Friday April 9 1999 9 44 AM...
Page 8: ...vi Gateway ALR 9250R User s Guide 9250R book Page vi Friday April 9 1999 9 44 AM...
Page 14: ...xii Gateway ALR 9250R User s Guide 9250R book Page xii Friday April 9 1999 9 44 AM...
Page 34: ...20 Gateway ALR 9250R User s Guide 9250R book Page 20 Friday April 9 1999 9 44 AM...
Page 56: ...42 Gateway ALR 9250R User s Guide 9250R book Page 42 Friday April 9 1999 9 44 AM...
Page 114: ...100 Gateway ALR 9250R User s Guide 9250R book Page 100 Friday April 9 1999 9 44 AM...
Page 134: ...120 Gateway ALR 9250R User s Guide 9250R book Page 120 Friday April 9 1999 9 44 AM...
Page 164: ...150 Gateway ALR 9250R User s Guide 9250R book Page 150 Friday April 9 1999 9 44 AM...
Page 186: ...172 Gateway ALR 9250R User s Guide 9250R book Page 172 Friday April 9 1999 9 44 AM...
Page 194: ...180 Gateway ALR 9250R User s Guide 9250R book Page 180 Friday April 9 1999 9 44 AM...
Page 206: ...192 Gateway ALR 9250R User s Guide 9250R book Page 192 Friday April 9 1999 9 44 AM...
Page 226: ...212 Gateway ALR 9250R User s Guide 9250R book Page 212 Friday April 9 1999 9 44 AM...