OPERATING INSTRUCTIONS
13
Gates Corporation
•
When crimping a two-piece coupling (e.g., GS,
PC) as soon as the die fingers contact the
ferrule, pull slightly on the hose assembly. That
ensures the ferrule-locking collar is properly located
over the stem locking groove.
•
Crimper will close to the position selected on the
dial vernier. Once it reaches that position, the
crimper stops automatically.
•
Press and hold the bottom yellow RETRACT
button until the crimper stops.
•
Crimp is now complete.
8.REMOVE HOSE ASSEMBLY.
9.MEASURE CRIMP DIAMETER TO
MAKE SURE IT’S WITHIN
TOLERANCE.
If not, discard assembly and
recalibrate. (Refer to Calibration for procedure.)
Crimp new assembly following steps 1-9 until
proper crimp diameter is achieved.
10. UNLOAD DIE SET.
•
Open crimper head fully.
•
Press the Quick Change Tool (QCT) in until it
bottoms out on the die shoe surface.
•
Twist QCT clockwise until die fingers are engaged
and withdraw QCT. This will pull the die fingers
out of the crimper head.
•
Place die fingers back into storage receptacle and
press downward.
•
Twist QCT handle counterclockwise to unload die
fingers.
•
Withdraw QCT.
Summary of Contents for GC32-XD
Page 20: ...18 Gates Corporation SCHEMATIC...
Page 24: ...22 Gates Corporation ADVANCED TROUBLESHOOTING...
Page 25: ...23 Gates Corporation ADVANCED TROUBLESHOOTING...
Page 26: ...24 Gates Corporation ADVANCED TROUBLESHOOTING...
Page 27: ...25 Gates Corporation ADVANCED TROUBLESHOOTING...
Page 28: ...26 Gates Corporation ADVANCED TROUBLESHOOTING...
Page 29: ...27 Gates Corporation ADVANCED TROUBLESHOOTING...
Page 30: ...28 Gates Corporation ADVANCED TROUBLESHOOTING...
Page 31: ...29 Gates Corporation ADVANCED TROUBLESHOOTING...
Page 32: ...30 Gates Corporation NOTES...
Page 33: ...NOTES 31 Gates Corporation...
Page 34: ...32 Gates Corporation NOTES...
Page 36: ...Gates Corporation P O Box 5887 Denver CO 80217 5887...