
12
Solarus 950 Owner’s Manual and User’s Guide
Installation and Setup
Unpacking and Inspection
Before continuing, you should have already followed the
Unpacking Instructions
that accompanied the packing crate.
N
OTE
:
Do not discard packing crate. Keep all packing materials.
Connections
Rear Panel Gas Line Connections
N
OTE
:
All gas line pressure regulator valves should remain closed until the
Solarus 950’s internal purging process cycle has been completed.
The clearly labeled gas inputs are located on the rear panel (Figure 4) and connect
directly to the input of the mass flow controllers. From left to right these lines are
Gas 1 (O
2
), Gas 2 (H
2
), Gas 3 (Ar). Gas inlet 3 can be configured to accept Ar
(default) or a mixture of 25% O
2
, 75% Ar. If a gas other than Ar is connected, the
system configuration must be changed correspondingly. See page 16.
ƒigure 4
Solarus 950 rear panel gas connection detail
N
OTE
:
The optional Gas 3 line can be configured to accept several different gas-
ses:
O
Default is Ar