11 SERVICE WORK ON THE CHASSIS
64
S04347-10
Main work
–
Check the throttle cable routing.
The throttle cable must be routed along the back of the handle-
bar, to the right of the frame, above the fuel tank bracket, and to
the carburetor.
» If the throttle cable is not routed as specified:
–
Correct the throttle cable routing.
Finishing work
–
Install the fuel tank.
–
Mount the seat. (
11.40
Checking the rubber grip
401197-01
–
Check the rubber grips on the handlebar for damage and wear and
to ensure they are firmly seated.
» If a rubber grip is damaged, worn or loose:
–
Change and secure the rubber grip.
Rubber grip adhesive (00062030051) (
11.41
Adjusting the basic position of the clutch lever
S04274-12
–
Adjust the basic position of the clutch lever to the size of the rider's
hand using adjusting screw
1
.
Info
Turn the adjusting screw clockwise to increase the distance
between the clutch lever and the handlebar.
Turn the adjusting screw counterclockwise to decrease the
distance between the clutch lever and the handlebar.
The range of adjustment is limited.
Turn the adjusting screw by hand only, and do not apply any
force.
Do not make any adjustments while riding.
Summary of Contents for MC 85 2023
Page 1: ...OWNER S MANUAL 2023 MC 85 Art no 3215093en...
Page 2: ......
Page 86: ...13 WHEELS TIRES 84 Guideline Spoke nipple M4 5 5 Nm 3 7 lbf ft Torque wrench kit 58429094000...
Page 118: ...20 TECHNICAL DATA 116 Screw front wheel spindle M20x1 5 35 Nm 25 8 lbf ft...
Page 128: ...2...
Page 133: ...7 PART 1 7...
Page 147: ...21 PART 3...
Page 153: ...27 PART 3...
Page 169: ...43 NOTES...
Page 170: ...44 NOTES...
Page 171: ......