11 SERVICE WORK ON THE CHASSIS
50
A00804-10
–
Tighten screw
4
.
Guideline
Screw, top steering
head
M20x1.5
12 Nm (8.9 lbf ft)
A00805-10
–
Mount and tighten screw
7
.
Guideline
Screw, top steer-
ing stem
M8
20 Nm (14.8 lbf ft)
Loctite
®
243™
A00806-10
–
Using a plastic hammer, tap lightly on the upper triple clamp to
avoid stresses.
–
Tighten screws
8
.
Guideline
Screw, top triple clamp M8
20 Nm (14.8 lbf ft)
–
Secure the wiring harness with cable holder
9
on the left.
A00797-12
–
Position the brake caliper. Mount and tighten screws
bk
.
Guideline
Screw, front
brake caliper
M8
25 Nm (18.4 lbf ft)
Loctite
®
243™
–
Position the brake line and the clamp. Mount and tighten
screws
bl
.
Guideline
Screw, brake line
holder
EJOT
1.7 Nm (1.25 lbf ft)
Finishing work
–
Install front fender. (
–
Mount the handlebar cushion.
–
Install the start number plate. (
–
Install the front wheel.
–
Check that the wiring harness, throttle cables, and brake and clutch
lines can move freely and are routed correctly.
–
Check the steering head bearing play. (
–
Remove the motorcycle from the lift stand. (