INSTALLATION
6 Ø 8,5mm (screws not included)
4x M8 L20mm
INSTALLATION
(picture 1)
• Use conductors that are dimensioned in accordance with
local electrical regulations. The selected cable must be able to
sustain periods of constant load of up to 63A.
• The installation must be carried out by an authorized installer.
1. Select suitable group fuse and cable dimension for the
electrical installation. Make sure to consider the cable length
during calculation to avoid risk of voltage drop.
Note: Due to high currents for a long time in the cable, there is a
high risk of voltage drop if the cable is under-dimensioned which
can damage the electronics in an EV.
2. Fill in the fuse and cable information in the Warranty form
located in the installation manual that is included in the box.
3. Mount the TWIN+ on a wall or pole according to picture 1-6.
NOTE! In cases with TWIN+ installed in a grid, Installation order
of the TWIN+ need to follow the order in the attached Master/
slave file. See picture 8