190-01007-C1
GTN Xi Part 23 AML STC Maintenance Manual
Rev. 1
Page 7-1
7 EQUIPMENT CONFIGURATION AND TESTING
This section provides procedures to be followed after an LRU is replaced. At the beginning of each LRU
section, instructions are given to guide the technician for various removal and replacement scenarios.
These instructions define necessary procedures to be followed for situations in which original equipment
was re-installed, as well as for situations in which new equipment (i.e., new serial number) is installed.