![Gared 5300 Series Installation, Operation And Maintenance Instructions Download Page 11](http://html1.mh-extra.com/html/gared/5300-series/5300-series_installation-operation-and-maintenance-instructions_3570436011.webp)
5300 Carbon Fiber Telescopic Volleyball System
10
8.
Once the net height is adjusted with the winch,
center the net on the winch top cable so that there is
equal space between the ends of the net and the
posts. Wrap the net straps around the posts as
shown in the illustration to the right and below. Pull
the straps tight and press the Velcro surfaces
together.
These straps are responsible for
maintaining the net tension
and may need to be
retightened periodically. Expect some initial stretch
in the net.
9.
Minor height adjustments can be made by screwing
the foot pads on the bottom of the posts in or out.
(Posts must be removed from the floor sleeves to
make adjustments, so it is best to measure before
attaching net)
10.
Install the net side markers, 7607-22-00, which will attach the net antenna to the net over
each side court line.
11.
Insert the net antenna. Antenna should be adjusted to mark the outer edge of the 30 ft
[9.144 m] court width.
12.
Install the buckle covers over each net strap buckle.
13.
Install post pads by wrapping pad around the post with the straps towards the court side of
post. Secure with the hook and loop straps sewn to the post padding.
14.
To take volleyball system down;
a.
Remove antenna.
b.
Unhook net straps from posts at both ends.
c.
Crank winch until net cable can be unhooked from snap links.
d.
Fold net up and transport net and posts to storage.