Page 18
4990497003 Date: 11/2016
TR20 Installation, Operating & Maintenance Manual
Commissioning
Figure 12. Commissioning Tests
No.
Description
1
Pressure Manometer
2
Temperature Gauge
3
Pressure Tapping (Inlet depression)
4
Temperature Tapping (Inlet)
5
Commissioning Filter
6
Pressure Gauge
7
Pressure Tapping (Discharge)
8
Temperature Tapping (Discharge)