background image

1. Fit the upper leg tubes (A) to lower leg 

tubes (B) with the moisture protection 
sleeves (D). Slide the moisture protection 
sleeves half way onto the joint of the 
upper leg tubes before pushing the lower
leg tubes into the sleeves and joint. 

2. Place finial (G) on top of the leg 

assemblies, insert screw (F) through the 
top of the three flattened leg assemblies 
and into the base of the finial. 
Tighten screw.

3. Connect all three leg assemblies by 

clipping them inside the 3 plastic rings 
(C). For best results the rings should be 
spaced approximately 0.30m (1') apart. 

4. Place assembled obelisk in desired 

location and mark the leg positions on 
the ground. Remove obelisk and drive 
hole maker (E) to a recommended depth 
of approximately 0.30m (1'). 
Insert legs into holes and firm earth 
around to secure.

Helpful hints:

You may find it easier to assemble your
obelisk horizontally on its side and then
carefully stand it upright to install.

Before assembling the obelisk, use one of
the plastic rings as a template to mark
out the 3 leg positions in the desired
location. This will aid fitting.

Soaking the moisture protection sleeves
in warm water for a few minutes prior to
fitting will make them more malleable
and will aid fitting.

Assembly

D

0.30m

0.32m

(1'

1

/

2

")

1.55m

(5'1")

0.30m

(1')

All sizes approx.

BELOW GROUND

HEIGHT ABOVE 

GROUND

WIDTH

TO

T

AL HEIGHT BEFORE FITTIN

G:

1.

85m 

(6

'1

")

A

B

G

F

E

C

Joint 

Moisture

Protection

Sleeve

Reviews: