background image

If you feel confident that you do not need to read through these instructions, see page 2….         January 09  

 

Detailed instructions with diagrams:…. 

Basic overview 

of what I am trying to achieve…

 

“For those of us who do not like reading instructions….” 

Rib 
Pan 

(F) Channels with 

cutouts (as shown). 

 

Note that the cutouts go to the inside of the panel to 

allow easy fitment of end walls on assembly 

Inside 

Outside 

1

: Front Wall 

If you choose to vary from these instructions your warranty will be impaired. 

Pg 2 

Hing

Hing

A.Join 2 x (A) 1830 sheets and (D) 

or (C) 740mm sheet depending on 
which way door is to swing. 

B.Use (H) door spacer to determine 

the correct opening size by placing 
on the bottom flange of the door 
jambs. Then fit (F) channels to tops 
and bottoms of sheeting.  

Spacer 

Channel 

Door jamb on inside 

Just  join  the  sheets  together  and  fit  the  channels  to  the  top  and  bottom  of  the  sheets  as  a  framing  to 
make 4 walls and the roof. Follow these basic steps:…. 

1. 

Front  Wall: 

Layout 2 x (A) 1830mm sheet, (C) sheet with door jamb attached and (D) door with the sheet 

attached beside them to your preferred configuration and join sheets. Cap the sheets with (F) 3745 channels 

(2 sided cutout - Top and 1 sided cutout - bottom). Use (H) Door spacers to make sure door fits gap OK 
(they sit on top of the jambs). Drill & Fix (Rivet or screw) at every 2nd rib. Attach door spacer at each end 
thru door jambs and channels. 5 fixings underneath into sheeting pan top and bottom. Fit padbolt.  

2. 

Back: 

Join 5 (A) 1830mm Sheets together. Cap with (F) Channels and fix thru every 2nd rib and at least 1 

fixing per sheet thru the back of the channel into the pan of the sheeting. 

More in high wind areas.

 

3. 

Roof

Join 5 (A) 1600mm Sheets together. Cap with (E) 3745mm Channels. Fix @ every 2nd rib. Attach (G) 

1600 “L”s to ribs at each end of sheeting at corners and 400mm apart in between. Same for 2nd roof panel. 
Fit Ridge Beam (I) to one of the roof panels and fix through the bottom flange and at ends. 

4. 

End  walls: 

Measure 1523mm to centre of (E) 3045mm channels and cut flanges only (not right through). Join 4 (B) sheets 

together to form gable wall. Cap with (E) 3000mm channels at bottom and bend 3045 channels over the top. Slip (J) Large 
Gable plates up under top channel and Small Gable plates underneath in centre of gable and fix to ribs and pans. Fix chan-
nels at corners, every 2nd rib in between and in the centre of the gable. 4 fixings up underneath into pan of sheeting and 

gable plate, top and Bottom. Same for other end 

5. 

Assembly: 

You have now made up your 6 panels. It‟s just, Join the corners and put the roof on! Make sure you have at 

least 6 fixings down each corner when you join the walls. Place, centralise & fix the roof panel that has the ridge beam fitted 
on thru the “L” into the top channel on both end walls. 1 at each end for now. Place, centre and fix to the other end wall. 

Slip the 2nd roof panel into ridge beam and fix. Inside: up into ridge beam and outside: thru “L”s every 400mm. You now 
need to fix down thru every 2nd pan in the roof into the top channels on the front and back walls. 

More  in  high  wind 

areas. 

Please make sure that you have removed all swarf filings as the rust spots that they produce may hinder any war-

ranty claims.  

Generally most fixings are spaced at 300mm apart

 

Keep fixings in the pans as close to the ribs as possible for added strength. 

Ribs will always protrude to the outside of the shed. 

Extra

 internal fixings is strongly recommended in high wind areas. 

Drawings are diagrammatic 

and are not necessarily to 
detail. 

To hinge the door on the oppo-
site side - simply put the top 

channel on the bottom and 

bottom on top. 

Channels will come 
short of ends of sheeting 

by 10 - 15mm on all 

panels 

(A) 

You will need: 

(A) 2 x 1830mm sheets 
(C) 740 wide sheet with door jamb 
(D) Pre-hinged door and sheet 
(F) 

1

 top and 

1

 bottom Channel 

(H) 2 x Door spacers 

C. 

Outside: 

Fix channel at 

corners and every 2nd rib 
between and thru door 
jambs and spacer 

D. 

Inside

: One fixing per sheet 

at each end up thru channel 
underside and thru door 
jambs/spacer 

E.  Fit padbolt to the outside of 

door.  

 
 
Note: Higher side of channel 
goes to inside of shed 

Fix through top and 
bottom of channels into 

Door jamb & spacer 

(A) 

If you feel confident that you do not need to read through these instructions, see page 2….         January 09  

 

2: Back Wall 

(A) 

(F) 

(A) 

(B) 

4: End Walls 

Door Brace Kit 

A.The  Door  braces  can  be  fitted  now  or 

after you have assembled your shed. 

B.Tuck  one  end  of  the  “Z”  between  the 

bottom  channel  of  the 

inside

  of  the 

door and the sheet. Do the same at the 
top overlapping in the centre behind the 

padbolt. If you have a locking “T” handle 
you will have to run the “Z”s the oppo-
site way to the diagram. 

C.Fix the “Z”s at the ends and in the cen-

tre to the channel it is tucked under and 
thru  the  overlap  in  the  centre.  2  or  3 

more  rivets  will  be  required  thru  the 
door sheeting into the “Z”, but they will 
need  to  be  fixed 

through from the out-
side  of  the  door  for 
neater appearance. 

D.You  may  need  to  cut 

or  bend  the  flange  at 

the bottom and top of 
the “Z” if it catches on 
door jamb when open-

ing or closing. 

Padbolt 

“Z” Brace 

If you choose to vary from these instructions your warranty will be impaired. 

Pg 3 

Inside 

Channels will end 

10 - 15 short of 
sheeting 

You need: 

2 x (F) Channels 
5 x (A) Sheets 

You need: 

All the (B) Gable Sheets  
2 x (E) 3000 Channels 
2 x (E) 3045 Channels 
4 x (J) Gable plates 

See  Fig  2 

on Page 4 

3: Roof 

You need: 

4 x (E) Channels 
10 x (A) 1600 Sheets 
4 x (G) “L”s 
1 x (I) Ridge beam 

A. Join  5  (A)  sheets  together  with 

2  fixings  thru  the  overlapping 
ribs making sure the ends of the 
sheets are flush. 

B.  Cap  sheeting  with  (F)  channels 

putting the cutouts top and bot-
tom same as the front wall. 

C. Fix  the  channels  thru  the  end 

ribs and every 2nd rib between. 

D. Make  sure  you  put  at  least  1 

fixing per sheet up thru the un-
derside  of  the  channel  into  the 
pan of the sheet.  

(F) 

A.  Join  5  (A)  1600mm  sheets  together 

same as the back. 

B.  Cap  sheeting  with  (E)  3745mm  chan-

nels. 

C.  Fix the channels every 2nd rib but not 

the corners at this stage 

D.  Place  the  short  flange  of  (G)  “L”  on 

top of the rib at 1 end. Make sure ends 
are flush with sheeting and put 

1

 fixing 

in  the  centre  to  hold  the  “L”.  Fix  the 
corners thru the channels and 

1

 more 

between  the  corner  and  the  centre 

fixing.  Perform  the  same  at  the  other 
end and next roof panel 

E.  Fit  (I)  Ridge  beam  to  one  roof  panel 

and fix thru internal flange and thru the 
ends of the ridge beam into “L”.  

(G) 

A.  Join 4 (B) sheets together to give a gable end wall as shown. 

B.  Make a cut in the flanges only at (1523mm) the centre of the 3045 channels 
C.  Cap the bottom of the sheets with a (E) 3000mm channel and bend the cut 3045 

channel over the top of the sheets. Fix at corners only for now. 

D.  Slip (J) Large Gable plate under channel at the top and Small Gable plate under-

neath  and  fix  to  sheeting  at  the  „s 

E.  Fix the channels at every 2nd rib and thru gable plate into sheeting ribs. 
F.  4 fixings up underneath thru channel into pan of sheet 
G.  Perform the same again for the other end wall. 

Reviews: