www.DeubaXXL.de
8
Prior to star
the installa
familiarize yourself with the relevant local rules and
regula
Find a stable and level place as a base. Set up the building only when the
wea
ry. Do not install if there are strong winds!
If possible, set up the greenhouse together with 3 or more people. Otherwise, there
could be material damage or even injuries.
Some parts may have sharp edges and may cause injury!
that panels may be damaged or people injured.
founda
should be at least 10 cm thick. Allow the concrete to dry for at least 48
hours.
When using a founda on, that is not poured from concrete, you have to de tely
observe, that the ground is rm and event. The product has to be connected to a
founda
Only when it’s aligned accurately, the greenhouse can be placed in a
durable and stable way. Even slightly leaning walls won’t t properly in the guides
provided for them and can be easily unhinged by the wind.
It is necessary to anchor the greenhouse to the ground. The big greenhouse has a large
contact surface for wind, which can lead t
cant injuries and/or damages.
Summary of Contents for 991467
Page 28: ...www DeubaXXL de 28 TEIL NR STK Ma 12 1 618 13 4 14 1 1255 15 2 635 16 A 1 1310 17 A 1 1310 18...
Page 36: ...www DeubaXXL de 36 2x 1...
Page 37: ...www DeubaXXL de 37 F 2 9 9 7 24 26 26...
Page 38: ...www DeubaXXL de 38 3 A A A A A A...
Page 39: ...www DeubaXXL de 39 A A 4...
Page 40: ...www DeubaXXL de 40 5 14...
Page 41: ...www DeubaXXL de 41 6 29 28 28 29 A B C...
Page 42: ...www DeubaXXL de 42 6 2x...
Page 43: ...www DeubaXXL de 43 7 14...
Page 44: ...www DeubaXXL de 44 35 33 5 4 55 11 11 8 51 18 15 32 59...
Page 45: ...www DeubaXXL de 45...