TWO POINT HOIST - ASSEMBLY INSTRUCTIONS
STEP #2: PLAN THE LOCATIONS OF THE EYE SCREW, POWERTRAK AND RING HOOKS PER THE ABOVE
SKETCH. INSTALL THESE COMPONENTS.
STEP 2 STEP 2
STEP 3 STEP 4
STEP #3: ATTACH THE BLOCK / TACKLE TO THE EYE SCREW WITH THE SUPPLIED SHACKLE.
STEP #4: SLIDE ON THE 2 MICRO PULLEYS ON THE RING HANGERS AND FED THE DROP CORDS
THROUGH THEM.
PG 3 QUESTIONS ???? CALL 1-866 664 2724 REV 1, 01/12