INSTALLATION INSTRUCTIONS
GT4011EE TWO POINT HOIST
USED W/ USED W/
STANDARD CEILING POWERTRAK
INSTALLATION INSTALLATION
SUPPLIED ITEMS METHOD METHOD
QUANTITY DESCRIPTION
1
SELF-LOCKING SAFETY BLOCK & TACKLE W/ X X
28 FT OF DROP CORDS
35 FT OF HOISTING CORD
2 WEB STRAPS W/ METAL BUCKLES X X
2
MICRO PULLEY X X
1 SHACKLE X X
1
ORGANIZER BLOCK X
2 #10 X 2 1/2" LG SCREWS X
1 SCREW EYE X X
2 PIGTAIL LAG SCREWS X
4 4
”
LAG SCREW X
4 WASHERS X
TOOLS REQUIRED - ELECTRIC DRIVER / DRILL & 3/32" & 7/32" BIT
TAPE MEASURE / PENCIL
STEP LADDER
SAFETY GLASSES
STUD FINDER OR SMALL BRAID NAILS & HAMMER (TO LOCATE JOIST
IF INSTALLING THROUGH DRYWALL.)
TWO INSTALLATION METHODS ARE DETAILED ON THE FOLLOWING PAGES
1 RECOMMENDED INSTALLATION W/ CEILING POWERTRAK & RING HOOKS
–
PGS 2 THRU 4
THIS INSTALLATION REQUIRES THE ADDITIONAL PURCHASE OF CEILING POWERTRAK AND 2 RING HOOKS.
THIS INSTALLATION HAS A MUCH NICER APPEARANCE AND IS EASIER TO INSTALL & ADJUST.
2 STANDARD INSTALLATION WITH SUPPLIED PARTS
–
PGS 5 THRU 8
THIS INSTALLATION IS DONE WITH THE SUPPLIED PARTS AND MOUNTS TO A 2X6 BOARD.
PG 1 QUESTIONS ???? CALL 1-866 664 2724 REV 1, 12/1