Garage Tek GT1005A Installation & Owner'S Manual Download Page 3

FRONT

OF CABINET

STEP 2B

D

F

A

DETAIL A

STEP 2C

F

D

 35 1/4" 

F

 1/2" 

STEP 2 AND 3

ARE CRITICAL TO HAVING THE CABINET HANG ON THE TEKPANEL WALL WITH HEAVY LOADS.

PVC

1/2" PIPE

SCHEDULE 40

X4

STEP 2A

2. ASSEMBLE POSTS:

A. LOCALLY PURCHASED 10FT LENGTHS OF PVC 1/2" PIPE, SCHEDULE 40. CUT INTO LENGTHS OF 35 1/4" TO MAKE 

THE POST (F). X4

B. THE POSTS (F) TO BE INSTALLED IN THE FOUR LOCATIONS SHOWN.

C. SLIDE EACH POSTFROM THE TOP HOLES THROUGH THE CABINET PAST THE BOTTOM HOLES.

LOCATE THE POST INSIDE THE HOLE OF EACH BOTTOM CAP (D) AND PUSH THE CAP (D) UP INTO THE BOTTOM 

HOLE OF THE CABINET. AT THE TOP, LOCATE EACH POST TO THE INSIDE THE HOLE OF EACH TOP CAP (D) AND 

PUSH THE CAP (D) INTO THE TOP CABINET HOLE. 

3. SECURE POSTS AND INSTALL BRACKET

A. WITH THE CABINET ON A SOLID SURFACE, PRESS DOWN ON THE CABINET TOP AND DRIVE SCREW (O) X6 INTO THE 

POSITIONS SHOWN. (PRESS ING DOWN ON THE CABINET TOP TAKES OUT THE CLEARANCE FROM "LOOSE" ASSEMBLY 

FITS AND INSURES THE DOORS SHUT PROPERLY WHEN HANGING ON THE TekPanel WALL.)

B. LOCATE THE PANEL BRACKET (N) ON THE BACK OF THE CABINET AND SECURE IN PLACE WITH X8 TekPanel SCREWS 

1 5/8"LONG. THE BRACKET HAS SELF LOCATING TABS FOR THE TOP , BUT BE SURE TO CENTER HORIZONTALLY ON THE 

PREVIOUSLY INSTALLED POSTS (F). AGAIN, PRESS DOWN ON THE CABINET TOP TO TAKE OUT THE CLEARANCE WHEN 

DRIVING THE SCREWS. REPEAT OF THE OTHER SIDE.

PAGE 3 OF 4 REV AUG 2021

Reviews: