Chapter 4: Adding a Stir/Purge to a VistaShield and Stand-Alone Operation--Unpacking
4 - 1
Chapter 4: Adding a Stir/Purge to a VistaShield and Stand-Alone
Operation
This chapter contains detailed instructions for adding a Stir/Purge Option to a separately purchased VistaShield.
It also discusses configuration of the Stir/Purge as a stand-alone device.
Unpacking
When you receive your Stir/Purge option, please verify that you have received the following items:
Stir/Purge unit
Stir/Purge Operators manual
Gamry Software installation CD-ROM
AC Line cord
12 V output desktop power supply
Quick-disconnect 1/
8” NPT
Quick-disconnect with shut-off
Qty 2 of 1/8” NPT to barbed
-end fitting
15-pin cable
(part # 985-00118)
Stir/Purge Configuration Kit (contains 8 screws)
Mounting the Stir/Purge to the VistaShield
Follow this step-by-step procedure to install the Stir/Purge option to the VistaShield.
1.
From underneath the chassis base, remove the four screws holding the four rubber feet on the VistaShield.
You will need a tool to prevent rotation of the nuts within the feet.
A ¼ inch nut driver can be used to hold the nuts. If you do not have this specific nut driver, use small
pliers to prevent rotation of the nuts.
Save the feet, screws, and nuts in a safe place. This hardware will be used if the Stir/Purge needs to be
removed and the feet reinstalled on the VistaShield.
2.
Place the VistaShield on top of the Stir/Purge, aligning the four screws with the four holes in the top of the
Stir/Purge chassis.
Summary of Contents for VistaShield Stir/Purge
Page 1: ...VistaShield Stir Purge Operator s Manual...
Page 2: ......
Page 6: ...iv...
Page 14: ...Chapter 1 Safety Considerations RoHS Compliance 1 6...
Page 22: ...Chapter 3 Unpacking and Installation Complete Unit Gas fitting installation 3 6...
Page 26: ...Disassembly of the Stir Purge from the VistaShield 4 4...
Page 36: ...Certificate of Conformance 6 4 Certificate of Conformance...
Page 38: ...Appendix C Specifications 6 6...