
21
Clamping the First Main String
Secure the tensioned main string using the
remaining f xed clamp. Repeat the proce-
dure for all of the remaining main strings
and tie off at the appropriate holes following
the racquet manufacturers specif cations.
This will determine the starting point for the
cross strings. If applicable, tie the
f rst cross
string using an appropriate starting knot.
Weaving the Cross Strings
Weave the cross strings over and under
the main strings being careful to alternate
the weave of each consecutive cross string
to be opposite of the previously installed
cross string.
STRINGING THE FRAME
Completing the String Job
Once the f nal cross string is tensioned
and clamped, tie off at the appropriate hole
specif ed by the racquet manufacturer. Re-
move the frame from the Mounting System
by loosening the Shoulder Supports and
Frame Supports.
Summary of Contents for 5800 Els
Page 1: ...OWNER S MANUAL Issue 7 June 2014 STRINGING MACHINE 5800 Els 6 POINT MOUNTING...
Page 30: ...30 NOTES...
Page 31: ...31 NOTES...