
2
PAGE
Parts List
PART NUMBER
QTY
DESCRIPTION
REF.
206981
1
CHIN-UP BAR WELD ASS'Y
1
207070
1
811051*
4
3/8" x 1 1/4" B.H.C.S.
817334*
4
3/8" LOCKWASHER
207069*
1
CHIN-UP STATION NAME PLATE
2
137618*
2
POP RIVET
135038*
2
1/2" ANCHOR ROD
SPECIFICATIONS
NOTE
:
THIS INSTALLATION BOOKET SHOULD BE
KEPT IN CUSTOMER'S FILE FOR FUTURE
REFERENCE
.
NOTE
: Read installation instructions thoroughly before
starting assembly. Pour concrete only after final
assembly is complete. Bracing material may be required
during assembly.
NOTE
: Do not overtighten bolts. To overtighten may
cause buckling or dimpling of some parts.
NOTE
: Do not tighten any nuts, bolts, rods, etc. until the
unit is completely assembled.
CHIN-UP BAR:
The Chin-Up Bar assembly shall be
constructed of 1.315" O.D. (12 GA) galvanized pipe,
1.029 O.D. galvanized pipe and 3/16" stainless steel
tabs. The Crossbar shall be an all welded construction
and coated with a custom formula of TGIC polyester
powder coating after fabrication.
HARDWARE
: All nuts, bolts, screws, inserts, and
lockwashers used in the assembly of all play equipment,
shall be stainless steel, yellow dichromate plated steel,
blue-coat plated steel, mechanically galvanized or
powder coated/yellow dichromate plated steel. All
primary fasteners shall be 300 series stainless steel.
Fasteners with yellow dichromate treatment have an
electro deposited, 99.9% pure zinc substrate applied
from a specially formulated solution sealed with a yellow
dichromate top coat designed to work in conjunction
with the zinc plating Yellow dichromate has a 320%
longer life to white corrosion and 275% longer to red
corrosionthan does hot-dip galvanizing.
SPECIFICATIONS
:
GAMETIME®
has a policy of
continuous improvement and reserves the right to
discontinue or change specifications without notice.
INSTALLATION INSTRUCTIONS
NOTE: THIS INSTALLATION BOOKLET SHOULD
BE KEPT IN CUSTOMER'S FILE FOR FUTURE
REFERENCE.
NOTE:
Do not overtighten bolts. To overtighten may
cause buckling or dimpling of some parts.
NOTE:
Read installation instructions thoroughly before
starting assembly. Pour concrete only after final
assembly is complete. Bracing material may be required
during assembly.
NOTE:
Do not tighten any nuts, bolts, rods, etc. until
the unit is completely assembled.
NOTE:
Assembly and leveling time will be greatly
reduced if a transit is used to set location and depth of
ground holes.
NOTE:
Due to extremes in weather and soil conditions,
hole sizes may have to be increased to meet local
conditions.
STEP 1:
Mark hole locations using Chin-Up Bars as
template.
STEP 2:
Dig required holes and place a brick or
equivalent at the bottom of holes (where shown) to
provide a solid foundation. Allow for this in hole depth.
See Detail 321.
STEP 3:
Lay all legs on ground arranged as required.
Begin assembly Bars using Detail 086. After all Bars are in
place, set the legs in the holes. Level all legs and cross
bars and support them with wood or wire guys until the unit
is ready for use. Be sure each leg is standing on a solid
foundation block.
STEP 4:
Pour concrete to within 1'-0" [30.48cm] of
ground level and fill remaining with compacted subgrade
and surfacing, Per Detail 321. Allow a minimum of 48
hours for concrete to cure and harden before using
Chin-Up Station.
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards
For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment
And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each
Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
HARDWARE COMPLETE