If you choose to vary from these instructions your warranty will be impaired

6

CHANNELS

Channels will end 15-20mm 

short at tops of end walls 

and 10-15mm at bottoms.

STEP 6 

END WALLS

Join 3 

E

 sheets together to create a gable end wall as shown. Make a cut in the 

centre (1145mm) of the 2290mm top channel 

I

 and cap the three 

E

 sheets. Cap 

the bottom of the sheets with an 

H

 2255mm channel. Rivet at corners only for 

now. Slip 

R

 gable plate under channel at the top and rivet to sheeting at the *.

Rivet the channels at every 2nd rib and thru gable plate into sheeting ribs.
Place 3 rivets up underneath through channel into pan of sheet.
Perform the same again for the other end.

I

R

H

E

YOU WILL NEED

4 x 1960mm angle cut sheets & 2 x 

2025mm gable cut sheets (end walls)

2 x 2255mm 'U' channels (bottom)

2 x 2290mm 'U' channels (top)

2 x gable plates

E

H

I

R

STEP 7 

DOOR BRACES

The door braces can be fitted now or after you have assembled your shed. 
Tuck one end of the 'Z' between the bottom channel of the inside of the 
door and the sheet. Do the same at the top, overlapping in the centre 
behind the padbolt. 

If you have a locking 'T' handle you will have to run the 'Z's the opposite 
way to the diagram.

Rivet the 'Z's at the ends, and in the centre of the channel it is tucked 
under, and through the overlap in the centre. Two or three more fixings will 
be required through the door sheeting into the 'Z', but they will need to be 
riveted through from the outside of the door for a neater appearance.
You may need to cut or bend the flange at the bottom and the top of the 
'Z' if it catches on the door jamb when opening or closing (diagram 1).

5

AFTER

DIAGRAM 1
BEFORE

YOU WILL NEED

2 x 'Z' Door braces

Fixings

O

N

ABOVE

Z door braces in position on 

the inside of door sheet

Summary of Contents for GVO 3030

Page 1: ...r or riveter Tape measure Ladder Non slip gloves good shoes and goggles A set of helping hands CALL 0508 454 873 for an installer near you Some parts have sharp edges and should be handled very carefu...

Page 2: ...door sheets 2 x narrow 1830 x 715mm sheets beside door 4 x 1960mm angle cut sheets 2 x 2025mm gable cut sheets end walls 2 x 2290mm U channels for end walls top 4 x 1600mm L flashings roof to side fl...

Page 3: ...ribs and the side U channels Attach the hinges P approx 150mm from the top and bottom of the door through the U channels The fixings should be centred on the side U channels Turn the door over and fi...

Page 4: ...sheeting by 10 15mm on all panels PADLOCK KEEPER ASSEMBLY KEEPER WASHER RIVET P F F K K YOU WILL NEED 2 x 3000mm U channels with ends cut 2 x 1586mm door spacers 3 x padbolts F K P GALVO TIP To hinge...

Page 5: ...ery second rib but not the corners at this stage Place the short flange of the first L flashing M on top of the rib at one end Make sure the ends are flush with the sheeting diagram 1 and put one fixi...

Page 6: ...channels bottom 2 x 2290mm U channels top 2 x gable plates E H I R STEP 7 DOOR BRACES The door braces can be fitted now or after you have assembled your shed Tuck one end of the Z between the bottom...

Page 7: ...l of the front and the back walls 10mm more than the overhang Fix beside every second rib You will not need to worry about these fixings leaking as any water seeping through these fixings will end up...

Page 8: ...nt or act of God including weather b The warranty shall cease and the Supplier shall thereafter in no circumstances be liable under the terms of the warranty if the workmanship is repaired altered or...

Reviews: