If you choose to vary from these instructions your warranty will be impaired
5
DIAGRAM 1
STEP 4
BACK WALL
Join the two sheets
C
together with 2 fixings through the overlapping
ribs, making sure the ends of the sheets are flush. Cap the sheeting with
the 1515mm 'U' channels
F
.
Fix the channels through the end ribs and every second rib in between.
Make sure you put at least one fixing per sheet up through the underside
of the channel into the pan of the sheet.
STEP 5
ROOF
Join the two sheets
D
together, same as the back. Cap the sheeting with the 1515mm 'U'
channels
F
. Fix the channels at every second rib but not the corners at this stage.
Place the short flange of the first 'L' flashing
K
on top of the rib at one end.
Make sure the ends are flush with the sheeting (diagram 1) and put
one fixing in the centre to hold the 'L' flashing. Fix the corners
through the channels and one more between the corner and
the centre fixing. Perform the same at the other end.
Use five fixings in each 'L' flashing.
GALVO TIP
Put extra fixings in for
high wind areas, particularly
on the underside.
YOU WILL NEED
2 x 1830mm for the roof
2 x 1515mm 'U' channels for the roof
2 x 1830mm 'L' flashings
D
F
K
YOU WILL NEED
2 x 1830mm sheets
2 x 1515mm 'U' channels
C
F
F
F
C
F
F
K
K
D