background image

 

 

 

 

Version 17 February 2017 Page 

3

 of 

3

 

Product Installation Guideline 

 

SERVICE AND MAINTENANCE 

 

 

 

1. Turn off water  

 

Turn off the water supply.  

 

Open shower outlet to release pressure. 

 

2. Remove control knob  

 

Unscrew tamper proof screw from control 
knob.   

 

Pull out control assembly from the body. 

 

3. Remove grub screw 

 

Unscrew grub screw to remove facplate 
and flange. (Note: Grub screw must be 
retrieved or replaced for re-assembly). 

 

 

 

4. Remove face plate and flange 

 

5. Remove catridge nut and check catridge 

 

Unscrew cartridge nut and remove 
cartridge. 

 

Check the cartridge for wear and 
damage. Replace if required with 
cartridge replacement available through 
your supplier. 

 

Check and clean the body of all debris.

 

6. Re-assemble 

 

Re-assemble, by reversing steps  
5 to 1. 

 

Turn on water and check for correct 
operation. 

 

WARRANTY 

 

The warranty set forth herein is given expressly and is the only warranty given by the Galvin Engineering Pty  Ltd. With respect to the product, 
Galvin Engineering Pty Ltd makes no other warranties, express or implied. Galvin Engineering Pty. Ltd. hereby specifically disclaims all other 
warranties, express or implied, including but not limited to the implied warranties of merchantability and fitness for a particular purpose. 
 
Galvin 

Engineering 

Pty 

Ltd 

products  are  covered  under  our  manufacturer’s  warranty  available  for  download  from 

www.galvinengineering.com.au    Galvin  Engineering  Pty  Ltd  expressly  warrants  that  the  product  is  free  from  operational  defects  in 
workmanship  and materials for  the  warranty  period  as  shown  on  the  schedule  in  the manufacturer’s  warranty.  During  the  warranty  period, 
Galvin Engineering will replace or repair any defective products manufactured by Galvin Engineering without charge, so long as the terms of 
the Manufacturer’s warranty are complied with. 
 
The remedy described in the first paragraph of this warranty shall constitute the sole and exclusive remedy for breach of warranty, and Galvin 
Engineering Pty Ltd shall not be responsible for any incidental, special or consequential damages, including without limitation, lost profits or 
the  cost  of  repairing  or  replacing  other  property  which  is  damaged  if  this  product  does  not  work  properly,  other  costs  resulting  from  labour 
charges, delays, vandalism, negligence, fouling caused by foreign material, damage from adverse water conditions, chemical, electrical or any 
other circumstances over which Galvin Engineering has no control. This warranty shall be invalidated by any abuse, misuse, misapplication, 
improper installation or improper maintenance or alteration of the product. 

Summary of Contents for SHWR-DV-01

Page 1: ...but is able to withstand heavy knocks Bevelled edges for maximum tight fixing This item is designed for panel wall installation wall thickness up to 20mm TECHNICAL DATA Inlet connections BSP Female 1...

Page 2: ...upply should be flushed before fitting The use of in line strainers is highly recommended 3 Fit face plate flange Fit O ring to flange groove Slide shower face plate on to body Tighten flange to secur...

Page 3: ...ility and fitness for a particular purpose Galvin Engineering Pty Ltd products are covered under our manufacturer s warranty available for download from www galvinengineering com au Galvin Engineering...

Page 4: ...Client Project TITLE Drg No SHOWER DIVERTER VALVE Scale All dimensions in mm All angles 90 unless stated 3rd REVISION HISTORY REV DATE DESCRIPTION BY CHKD 3 02 11 2016 Graphics control size updated P...

Page 5: ...to the valve body to hold it in position on the wall panel whilst securing the bracket with screws Adjustment of the bracket position on the valve body may be necessary to move the valve forwards or...

Page 6: ...BE REPRODUCED COPIED OR USED WITHOUT PRIOR AGREEMENT OF WALLGATE LTD A3 Limits unless stated 0 25mm sheetmetal 0 10mm machined 2 00mm pattern 5 00mm moulded c O 2016 Copyright Model Client Project TIT...

Page 7: ...ORTANT NOTE THE WATER SUPPLY MUST BE FLUSHED THROUGH TO REMOVE ANY DEBRIS PRIOR TO CONNECTION TO THE VALVE ENSURE PLUMBING THREAD SEALENTS IF USED ARE NOT APPLIED EXCESSIVELY WHEREBY DAMAGE TO THE VAL...

Reviews: