Galvin Engineering TCS9J150C Installation Manuallines Download Page 6

 

© Galvin Engineering Pty Ltd 

 

Version 1, 4 November 2022, Page 

6

 of 

7

 

Product Installation Guidelines 

Document No.: 001.00.10.16 

Version 1, 4 November 2022, Page 

6

 of 

7

 

INSTALLATION 

– WALL TOP ASSEMBLY

 

IMPORTANT: Galvin Specialised products must be installed in accordance with these installation instructions and 
in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical supply 
conditions  must  also  comply  to  the  applicable  national  and/or  state  standards.  Failing  to  comply  with  these 
provisions shall void the product warranty and may affect the performance of the product.

 

 

 

1. Fit spindle assembly 

 

Remove handle and flange from cartridge 
assembly. Unscrew the ¼ turn ceramic head part 
from the threaded sleeve assembly and screw 
ceramic cartridge into the valve body by hand,  
tighten using a 17mm spanner.

 

 

Refit threaded sleeve and spindle.

 

 

The ¼ turn ceramic head part MUST be fitted 
into the wall body prior to refitting the 
threaded sleeve and spindle. DO NOT tighten 
cartridge by using the spindle or the threaded 
sleeve. 

2. Fit wall flange 

 

Ensure o-ring is fitted to the bottom of the wall 
flange, and then hand-tighten the wall flange 
onto the threaded sleeve.

 

 

 

3. Fit handle 

 

Ensure the spindle is in the closed position 
and firmly press the CliniLever

®

 lever handle 

onto the spindle in the desired orientation.

 

 

Check operation of CliniLever

®

 lever handle. 

They should turn freely for a full ¼ turn.

 

 

Secure the handle in position using the 
supplied washer and stainless steel cap 
screw.

 

4

.

 Fit water temperature indicator & testing 

 

Once CliniLever

®

 lever handle is secure; fit the 

appropriate water temperature indicator.

 

 

Once temperature indicator is fitted, check the 
operation of the unit and inspect for any leaks.

 

 

 
 
 

Summary of Contents for TCS9J150C

Page 1: ...event back siphonage 80 150 mm CliniLever contra rotating lever handles make showering easier for users with disabilities or limited hand mobility Handles are finished in bright chrome plate finish for added durability and easy cleaning Suitable for installation and will assist in compliance to AS1428 1 Design for access and mobility General requirements for access New building work IMPORTANT All ...

Page 2: ... Galvin Engineering Pty Ltd Product Installation Guidelines Document No 001 00 10 16 Version 1 4 November 2022 Page 2 of 7 PRE INSTALLATION MOUNTING DETAILS SHOWER ...

Page 3: ...ion Guidelines Document No 001 00 10 16 Version 1 4 November 2022 Page 3 of 7 MOUNTING DETAILS WALL TOP ASSEMBLY Wall body Wall body must be G5 8 FI and body should be between 0 and 15mm behind the finished wall surface 80 150 mm Wall Top Assembly ...

Page 4: ... Other type of screws may rust and void warranty When marking out the grab rails use centre base holes of flange protector When marking out corner grab rails follow the fixing guide lug diagram shown above to suit grab rail orientation 1 Install straight grab rails including the horizontal section of any grab rail if applicable as per AS 1428 1 800 810mm from floor to top of rail Make sure the wal...

Page 5: ...ead tape or sealant to the wall spud ensure the opening is not obscured Failure to do so may restrict or block the flow restrictor affecting the flow of water Remove spigot by loosening grub screw in elbow Fit spigot to wall spud ensuring the flow regulator is in place and not damaged when tightening the spigot 9 Connect Flange Wall Outlet Elbow Fit elbow over spigot and secure with grub screw Usi...

Page 6: ...amic cartridge into the valve body by hand tighten using a 17mm spanner Refit threaded sleeve and spindle The turn ceramic head part MUST be fitted into the wall body prior to refitting the threaded sleeve and spindle DO NOT tighten cartridge by using the spindle or the threaded sleeve 2 Fit wall flange Ensure o ring is fitted to the bottom of the wall flange and then hand tighten the wall flange ...

Page 7: ...makes no other warranties express or implied Galvin Engineering Pty Ltd hereby specifically disclaims all other warranties express or implied including but not limited to the implied warranties of merchantability and fitness for a particular purpose Galvin Engineering Pty Ltd products are covered under our manufacturer s warranty available for download from www galvinengineering com au Galvin Engi...

Reviews: