background image

 

Version 3.1, 13

tth 

Aug. 2021, Page 

3

 of 

7

 

 

 

 

 

 

 

 

INSTALLATION PROCEDURE

 

Refer to Installation Drawing for clarification. Check parts list to ensure all required 
parts are included. Use AS 4020 approved pipe joint sealant on all connections. 

 

STEP 1: 

Prepare the emergency shower foundation by using the floor flange as a 
template. Locate the three holes for the 3/8-

16 UNC x 6” anchor bolts. (Not 

supplied). They should extend 

1” above the floor level. 

STEP 2: 

Once the concrete foundation is ready (dry), assemble the floor flange to the 
anchor bolts; then securely fasten with 3/8-16 UNC Hex nuts and 

3/8” 

washers (Not supplied). Seal and tighten floor flange and (1-

1/4”) tee making 

certain the waste tee is facing the proper location and the foot control holes 
are facing side to side. 

STEP 3: 

Assemble nipple (1-

1/4” x 24”) to the tee and tighten with a pipe wrench. 

STEP 4: 

Assemble the eye/

face wash loop assembly to the (24”) nipple from Step 

three. Connect the pipe wrench to the nipple between the two tees to avoid 
damage. 

STEP 5: 

Assemble in the following order: 
Attach nipple (1

-

1/4” x 24”) onto the loop assembly. 

Attach nipple (1-

1/4” x 24”) onto the tee. 

Attach tee (1-

1/4” x 1-1/4” x 1”) onto nipple. 

Attach nipple 

(1” x 8”) and valve assembly onto tee. 

Attach street elbow 

(1”) and nipple (1” x 12-1/2”) onto valve. 

STEP 6:  

Assemble showerhead onto street elbow (1”).  

STEP 7: 

Assemble the sign onto the unit. Use the strap, screws, washers and nuts 
provided  to  mount  the  sign  onto  the  upright.  The  sign  should  be 
positioned for maximum visibility. 

STEP 8: 

Insert the plug into the optional supply line tee that is not used. Before 
connecting the supply water line to the emergency shower; 

CHECK IF THE 

ASSEMBLY IS RIGIDLY TIGHTENED AND FLUSH THE LINE 
THOROUGHLY.

 

 

Reviews: