6.0 

WATER SUPPLY CONDITIONS  

INTRODUCTION 

This CliniMix

®

 CP-BS Inwall Thermo  Progressive ShowerMixer w/ GalvinCare Handle  W&C  is manufactured to 

the highest standards. When installed the supply conditions detailed below must be observed.

 

SUPPLY REQUIREMENTS 

This mixer is designed to be installed on all types of plumbing systems. 

Hot  and  cold  water  supply  pressures  should  be  reasonably  balanced;  however,  the  mixer  will  function  within 
specification on unequal pressures up to 10:1. 

The  mixer  has  integral  isolating  valves  which  permit  servicing  of  the  strainer,  check  valve/flow  regulator  and 
thermostatic cartridge. They are also used for thermal disinfection. 

The  minimum  pressure  for  the  correct  thermal  operation  is  20kPa.  However,  to  achieve  an  acceptable  flow 
performance at very low pressures it may be necessary to remove the combined check valve and flow regulators 
and replace them with simple check valves. 

Hot Temperature Supply Range (°C) 

Min 

Max 

85 

Minimum Temperature Differential (between the supply and the outlet temperature) (°C) 

10 

Adjustable Temperature Range 

Min 

35 

Max 

48 

Maximum Static Pressure (kPa) 

1000 

Working Pressure Range (kPa) 

Min 

20 

Max 

500* 

Maximum Outlet Pressure (kPa) 

500 

Permitted Supply Pressure Variation 

10:1 

Factory Set Thermostatic Temp. (°C) 

41 

Maximum Thermostatic Temperature (°C) 

48 

Minimum Flow Rate for Stable Outlet Temperature (LPM) 

Maximum Flow Rate (LPM@300kPa) 

18 

*Tapware must be installed in accordance with the provisions of AS/NZS 3500.  Installations not complying with AS/NZS 3500 may void the 
product and performance warranty provisions. 

 

7.0 

INSTALLATION 

The CliniMix

®

 Thermostatic Progressive Mixing Valves must be installed using the appropriate Standard, Code 

of Practice and legislation applicable to point of install. 

The CliniMix

®

 Thermostatic Progressive Mixing Valves must be installed by a licensed plumber.

 

If  the  valve  is  not  installed  correctly  then  it  will  not  function  correctly  and  may  put the  user  in  danger.  It  may 
also void the warranty of the valve. 

Prior  to  the  installation  of  the  valve,  the  system  must  be  checked  to  ensure  that  the  system  operating 
conditions  fall  within  the  recommended  operating  range  of  the  CliniMix

®

  Thermostatic  Progressive  Mixing 

Valve.  If  the  hot  water  supply  temperature  is  greater  than  90°  Celsius,  the  valve  may  be  damaged.  If  the 
temperature of the hot water will rise above 90° Celsius a suitable temperature limiting valve must be fitted to 
the  hot  water  supply,  prior  to  the  inlet  fittings.  This  temperature  limiting  valve  must  be  installed  as  per  the 
m nuf  turer’s   nstru t  ns    t   s   mp rtant  that  both  inlet  dynamic  supply  pressures  are  500kPa  or  less.  If 
either supply pressure exceeds 500kPa then a suitable pressure reducing valve must be fitted prior to the inlet 
control valve to reduce the pressure to an acceptable limit.  

These pressure reducing valves must be installed as per the 

m nuf  turer’s  nstru t  ns  T    h eve  pt mum 

performance  from  the  valve  it  is  recommended  that  the  inlet  pressures  are  balanced  to  within  10%  of  each 
other. 

To ensure that the mixing valve operates correctly, it is necessary that the pipe-work is thoroughly flushed with 

Summary of Contents for CliniMix CP-BS

Page 1: ...s The GalvinCare paddle handle provides straight forward temperature control and minimises ligature risk Suitable for high and low pressure systems with a thermostatically controlled water temperature...

Page 2: ...e operation provided it is installed commissioned operated and maintained as per the recommendations outlined in this manual It should be noted however that this valve should not be considered as an a...

Page 3: ...cordance with the provisions of AS NZS 3500 Installations not complying with AS NZS 3500 may void the product and performance warranty provisions 7 0 INSTALLATION The CliniMix Thermostatic Progressive...

Page 4: ...s a split second it is still considered to be outside the operating conditions and may cause the valve to operate incorrectly In the event that this does occur measures must be taken to control the sp...

Page 5: ...Before tightening the flange make sure the handle fits correctly Put screws into flange and tighten finger tight the flange should still be able to move Slide the handle onto spline and move the flang...

Page 6: ...f the outlet temperature requires adjustment then follow the temperature adjustment in the installation instructions Shut Down Test Once the correct outlet temperature has been achieved the valves int...

Page 7: ...flow to stabilise for at least 15 seconds and record the temperature Quickly isolate the hot water supply to the valve The outlet flow should quickly reduce to be less than 0 4L min following the isol...

Page 8: ...a time to avoid the flange moving Refit handle 8 Fit the handle and fasten so the arrow shape on top of the handle matches the marking on the faceplate 11 0 ADJUSTMENT OF THE MIX TEMPERATURE 1 Set the...

Page 9: ...ove cartridge nut and check cartridge Unscrew cartridge and remove from body Check the cartridge for wear and damage Replace if required replacement cartridge available through your supplier Check and...

Page 10: ...mperature outlet then a 6 monthly servicing cycle may be adopted Otherwise servicing checks should be carried out more frequently e g every 4 months Follow the recommended maintenance procedures detai...

Page 11: ...aged Raise hot water temperature Clean the cartridge ensuring that all debris is removed Mix temperature unstable Flow rate below 2L min Thermostatic cartridge contains debris or is damaged Strainers...

Page 12: ...hat system must be in accordance with its m nuf turer s re mmend t n the C de nd re ev nt st tut ry nd t te r Terr t ry requ rements 4 The valve must be returned to Galvin Engineering together with a...

Page 13: ...Pressure ________kPa Cold Water Pressure _______kPa Make of Mixing Valve _______________________ Model No ________________________ Size _________ Valve Location Building ______________________________...

Page 14: ...k It is hereby certified that all the commissioning work has been carried out by the undersigned in accordance with the requirements of the Codes of Practice indicated prior Date of Valve Commissioned...

Page 15: ...f Warm Water C One Outlet in Use All Req d Outlets in Use One Outlet in Use All Req d Outlets in Use 1 2 3 4 5 6 7 8 9 10 11 Give details of brand and model designation Commensurate with the design fl...

Page 16: ..._______________________________Signature ______________________ Date _______________________ Maintenance Tests Yes Date of Previous Service ______________________________________________ Previous Serv...