© Galvin Engineering Pty Ltd
Product Installation Guidelines
Document No.: 001.00.10.17
Version 1, 4 November 2022, Page
2
of
4
PRE-INSTALLATION -
MOUNTING DETAILS
Wall Spud
− Wall spuds must be ½” BSP MI and protrude from the finished wall by no more than 15mm
Note: In some situations a male thread connection on the tap may be more suited. If so, please
contact Galvin Engineering.
INSTALLATION
IMPORTANT: Galvin Specialised products must be installed in accordance with these installation
instructions and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water
and/or electrical supply conditions must also comply to the applicable national and/or state standards.
Failing to comply with these provisions shall void the product warranty and may affect the performance of
the product.
1. Fit washing machine body
−
Fit the washing machine body assembly with
the wall flange to the spud and fasten with a
spanner.
−
We recommend using thread tape or
equivalent to ensure the connection does not
leak.
−
DO NOT tighten the body by using the top
assembly.
2. Fit handle
−
Ensure the spindle is in the closed position
and firmly press the lever handle onto the
spindle in the desired orientation.
−
Check lever handles for correct operation.
−
Secure the handle in position using the
supplied washer and stainless steel cap
screw.
½” BSP MI