background image

 

© Galvin Engineering Pty Ltd 

 

Product Installation Guidelines 

Document No.: 001.00.10.17 

Version 1, 4 November 2022, Page 

2

 of 

4

 

PRE-INSTALLATION - 

MOUNTING DETAILS

 

Wall Spud 
 

− Wall spuds must be ½” BSP MI and protrude from the finished wall by no more than 15mm  

Note:  In some situations a male thread connection on the tap may be more suited. If so, please 
contact Galvin Engineering.

 

 

   

 

 

INSTALLATION

 

IMPORTANT:  Galvin  Specialised  products  must  be  installed  in  accordance  with  these  installation 
instructions and  in accordance with AS/NZS 3500, the PCA and your local regulatory requirements.  Water 
and/or  electrical  supply  conditions  must  also  comply  to  the  applicable  national  and/or  state  standards. 
Failing  to comply  with these  provisions  shall  void  the  product  warranty  and  may  affect  the  performance  of 
the product. 

 

1. Fit washing machine body 

 

Fit the washing machine body assembly with 
the wall flange to the spud and fasten with a 
spanner.

 

 

We recommend using thread tape or 
equivalent to ensure the connection does not 
leak.

 

 

DO NOT tighten the body by using the top 
assembly.

 

 

2. Fit handle 

 

Ensure the spindle is in the closed position 
and firmly press the lever handle onto the 
spindle in the desired orientation. 

 

 

Check lever handles for correct operation.

 

 

Secure the handle in position using the 
supplied washer and stainless steel cap 
screw.

 

½” BSP MI 

Reviews: