background image

 

 

Version 1, 31 October 2019, Page 

3

 of 

5

 

INSTALLATION

 

INSTALLATION COMPLIANCE: Galvin Engineering products must be installed in accordance with these 
installation  instructions  and  in  accordance  with  AS/NZS  3500,  the  PCA  and  your  local  regulatory 
requirements. Water and/or electrical supply conditions must also comply to the applicable national and/or 
state standards. Failing to comply with these provisions shall void the product warranty and may affect 
the performance of the product.  
  

IMPORTANT:    Whilst  our  product  designs  take  into  account  a  broad  range  of  installation  types  and 
surfaces,  it  is  important  that  surfaces  which  fixtures  are  mounted  to  are  flat  and  free  from  defect. 
Additionally, ensure any protruding connecting thread is square to the wall so that the outlet sits flat against 
the wall when installed, ensuring that there are no gaps between the wall and outlet.  This is especially 
important when installing  product ranges that have been designed for correctional and health facilities, 
where special attention is required to minimise ligature points and areas for concealment of contraband. 
In addition to ensuring the products are fitted securely and in accordance with the following instructions, 
consideration shall be given to the use of non-

pick mastics such as BASF Sonolastic “Ultra” to ensure a 

high quality and safe installation.

 

 

 

1.  Top Flange  

Mark the height of the top flange centre point by 
measuring vertically 2275mm above the floor. 
Then measure approximately 150mm horizontally 
to the left or right (depending on the position of 
the shower recess) of the centre of the existing 
supply fitting. Drill 2 holes Ø8 x 50mm deep, 
38mm horizontally apart to suit the top flange. 

2.  Bottom Flange  

Mark the 

position of the bottom flange’s centre point 

400mm below the top flange’s centre

 

point. Then 

mark the two holes for mounting the bottom flange 
similar to the manner as the top flange. 
 

Note:

 The bottom flange is mounted in a vertical 

orientation. 
 

Important:

 

the functionality of this product relies on 

the accuracy of the vertical alignment between the top 
and bottom flanges.

 

 

 

3.  Mount the shower arm 

Attach both the wall flanges using the plastic star 
plugs and self-tapping screws supplied (these 
fasteners may not be appropriate for all wall 
materials. If this is the case, other fastening 
systems will have to be sourced by the installer).

 

4.  Attach the hose (not supplied) 

When fitting the inlet hose, lay the arm against the 
wall in the 

preferred ‘resting’ position, then tighten the 

hose. The arm will tend to return to this position when 
not in use. 

38

DRILL 2 HOLES

Ø8x50 DEEP

2275mm ABOVE
THE FLOOR

Reviews: