Revision 5
22
August 2021
The user should fully understand each step of the installation process prior to
proceeding with installation. If there are any concerns with the installation process,
please contact Galvanic Applied Sciences Inc. for assistance.
2.4.1 Mounting of the Analyzer System
When mounting the 943-TGS-CE system, it is necessary to mount both the oven cabinet and
the control cabinet in suitable locations.
2.4.1.1 Mounting of the Oven Cabinet
The oven cabinet is supported by a cradle that mounts to the process pipe structure. The
oven must be situated such that the probe opening in the bottom of the cabinet aligns
with the process connection. See Figure 2 for mounting details.
Figure 2: 943-TGS-CE Oven Cabinet Dimensions and Mounting Details
Summary of Contents for 943-TGS-CE
Page 137: ...Revision 5 137 August 2021 Figure 84 Oven Cabinet Details...
Page 138: ...Revision 5 138 August 2021 Figure 85 Control Cabinet Door Closed...
Page 139: ...Revision 5 139 August 2021 Figure 86 Control Cabinet Door Removed...
Page 140: ...Revision 5 140 August 2021 Figure 87 Power Steam Air Signals Connection Details...
Page 141: ...Revision 5 141 August 2021 Figure 88 AC Wiring Schematic...
Page 142: ...Revision 5 142 August 2021 Figure 89 DC Signals and Wiring Diagram...
Page 143: ...Revision 5 143 August 2021 Figure 90 Flow Diagram...
Page 144: ...Revision 5 144 August 2021 Figure 91 Control and Oven Cabinets Interconnect Wiring...