Revision 5
19
August 2021
Section 2
Installation
The initial installation of the analyzer system is usually completed by the purchaser.
The start-up and commissioning is usually performed by Galvanic Applied Sciences
Inc. personnel.
2.1
Receiving the System
When the system arrives, inspect the packaging for external signs of damage. If there is any
obvious physical damage, contact the shipping agent and Galvanic Applied Sciences to report
the damage and request that the carrier's agent be present when the unit is unpacked. It is
recommended that you retain the shipping container so that it may be used for future shipment
of the unit, if necessary.
2.2
Environmental Requirements
2.2.1 Electrical Requirements
The required power input is 100 – 240 Vac, 1 phase, 50/60 Hz, 800 W. The operating voltage
is specified on the serial number name plate
2.2.2 Temperature
The ambient temperature range the analyzer can operate in is given in Table 1
Table 1: Ambient Temperature Range
Model
Ambient Temperature Range
943-TGS-CE
-20 to 60°C (-4 to 140°F)
Galvanic offers complete analyzer shelters from sunshades to complete buildings; please
contact Galvanic Applied Sciences, Inc. (or your local representative) for additional
information.
2.2.3 Space Requirements
The overall outer dimensions of the oven enclosure are 27.5” (70 cm) H x 30.5” (77.5 cm)
W x 25.5” (64.8 cm) D. The installation should allow for access to the oven and the ability
to remove the cover. The overall outer dimensions of the control cabinet are 46” (116.8
cm) H x 33” (83.8 cm) W x 15” (38.1 cm) D. The control cabinet installation location should
allow for the cabinet door to be opened to at least 90 degrees. The control cabinet should
also be mounted such that the display is at or near eye level for ease of operation.
Summary of Contents for 943-TGS-CE
Page 137: ...Revision 5 137 August 2021 Figure 84 Oven Cabinet Details...
Page 138: ...Revision 5 138 August 2021 Figure 85 Control Cabinet Door Closed...
Page 139: ...Revision 5 139 August 2021 Figure 86 Control Cabinet Door Removed...
Page 140: ...Revision 5 140 August 2021 Figure 87 Power Steam Air Signals Connection Details...
Page 141: ...Revision 5 141 August 2021 Figure 88 AC Wiring Schematic...
Page 142: ...Revision 5 142 August 2021 Figure 89 DC Signals and Wiring Diagram...
Page 143: ...Revision 5 143 August 2021 Figure 90 Flow Diagram...
Page 144: ...Revision 5 144 August 2021 Figure 91 Control and Oven Cabinets Interconnect Wiring...